13.07.2015 Views

Residents' Annual Report 2010/11 - Swan Housing Association

Residents' Annual Report 2010/11 - Swan Housing Association

Residents' Annual Report 2010/11 - Swan Housing Association

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Regenerating Our EstatesNew development in constructionSolar panels on new propertiesCranes Court - BasildonCranes Court was formerly used by <strong>Swan</strong> as a foyerand parent and baby accommodation, but as theywere not designed for this purpose we haveprovided a new foyer in Basildon. The site providedan ideal opportunity for <strong>Swan</strong> to build a Code forSustainable Homes Level 6 scheme.A property which achieves level 6 of the Code forSustainable Homes is “zero carbon”. A zero carbonscheme is one which has no negative impact on theenvironment. All the energy needed will be suppliedwithin the development and be from a renewablesource (for example, using the sun or wind toproduce electricity). In addition to having to produceall the energy it needs, the property may have waterrecycling to reduce the amount of water needed,which will lessen the property’s impact on theenvironment.The key features of the scheme are:• Rainwater harvesting.• Combined heat and power generator.• Whole house ventilation.• “Smart” electric meters.• Triple glazed windows.• 100% Lifetime Homes compliance.• Locally sourced materials.This scheme completes in January 2012 and willprovide 28 homes for rent.The Development and Regeneration Team are ontarget to increase <strong>Swan</strong>’s housing stock by 5% eachyear. Schemes such as Cambridge Road in Barking,Angel Way in Romford and Peachy House in Ilfordare progressing through planning and will shortly beon site.How did we do?Performance April <strong>2010</strong> to March 20<strong>11</strong>We completed 99 new homes during the year.Improving our services in 20<strong>11</strong>/2012We have secured funding from the Homes andCommunities Agency under their 20<strong>11</strong>/15Affordable <strong>Housing</strong> Programme to help deliver 1,500homes over the next four years.We will:• Renew our specification of works on ourregeneration sites to ensure that residentfeedback is incorporated into our new designbriefs.23 Residents’ <strong>Annual</strong> <strong>Report</strong> www.swan.org.uk

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!