13.07.2015 Views

RTMC Model Conditions of Contract - Highways Agency

RTMC Model Conditions of Contract - Highways Agency

RTMC Model Conditions of Contract - Highways Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Regional Technology Maintenance <strong>Contract</strong><strong>Conditions</strong> <strong>of</strong> <strong>Contract</strong>• The period for reply is two weeks.• The Adjudicator nominating body is the President for the time being <strong>of</strong> theInstitution <strong>of</strong> Civil Engineers or his nominee.• The tribunal is arbitration• The arbitration procedure is Institution <strong>of</strong> Civil Engineers ArbitrationProcedure (2006)• The place where the arbitration is to be held is London• The person or organisation who will choose an arbitrator• if the Parties cannot agree a choice or• if the arbitration procedure does not state who selects an arbitratoris the President for the time being <strong>of</strong> the Institution <strong>of</strong> Civil Engineers or hisnominee3 Time • The starting date is……………………………………………..• The access date is……………………………………………………………..• The service period is [5] years unless modified in accordance with thiscontract.• The extension period is [3] years.• The <strong>Contract</strong>or submits a first plan for acceptance in accordance with theService Information5 Payment • The assessment interval is one calendar month• The currency <strong>of</strong> this contract is the pound sterling (£)• The interest rate is 3 % per annum (not less than 2) above the base rate <strong>of</strong>the Bank <strong>of</strong> England.• The <strong>Contract</strong>or prepares forecasts <strong>of</strong> the final total <strong>of</strong> the Prices for thewhole <strong>of</strong> the service at intervals no longer than one calendar month andprovides these with his application for payment• The period for payment is 30 days after the date on which payment is due8 Risks andinsurance• The minimum amount <strong>of</strong> cover for insurance against loss <strong>of</strong> or damagecaused by the <strong>Contract</strong>or to the Employer's property is £40,000,000 (fortymillion pounds)• The minimum amount <strong>of</strong> cover for loss <strong>of</strong> or damage to Plant and Materialsprovided by the Employer is £10,000,000 (ten million pounds)• The minimum amount <strong>of</strong> cover for insurance in respect <strong>of</strong> loss <strong>of</strong> or damage<strong>RTMC</strong> CoC, Issue 1, Rev 0 July 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!