RTMC Model Conditions of Contract - Highways Agency

RTMC Model Conditions of Contract - Highways Agency RTMC Model Conditions of Contract - Highways Agency

assets.highways.gov.uk
from assets.highways.gov.uk More from this publisher
13.07.2015 Views

Regional Technology Maintenance ContractConditions of Contractthe Contractor.(66) NLA is The Newspaper Licensing Agency Limited.(67) Nonconformity has the meaning given to it in ISO 9000.(68) NRTS Co. is the National Roads TelecommunicationsServices Company employed by the Employer.(69) NTIS is the Employer’s National Traffic Information Service.(70) Original Scheme means the Local Government PensionScheme or such other public service pension scheme aswas applicable.(71) Operational Performance Indicators are measures ofperformance of part of the service in respect of safety,Department of Transport indicators, integrated assetmanagement, asset maintenance, Scheme development,cost, time Efficiency Improvements and Innovation,customer service, quality management, sustainability, andease of doing business with for which thresholds, targetsand/or weightings will be set by the Employer on or beforethe access date.(72)Not Used.(73) Not Used(74) Outgoing Contractor is any agent or contractor appointedby the Employer or Others to carry out works or provideservices similar to the service in relation to the AffectedProperty and/or the Traffic Technology Systems during theperiod immediately prior to the access date.(75) Outgoing Contractor’s Pension Scheme is the registeredpension scheme or schemes operated by an OutgoingContractor immediately prior to the access date which hasbeen certified by the Government Actuary’s Department asproviding benefits which are broadly comparable to thoseprovided by the Original Scheme.(76) Not Used.(77)Personal Data is information received by the Contractor inrelation to this contract, which relates to living individualswho can be identifiedRTMC CoC, Issue 1, Rev 0 July 2011

Regional Technology Maintenance ContractConditions of Contract• from that information or• from that information combined with other details in (orlikely to come into) the possession of the Employer.(78) Premises means the facilities provided by the ServiceManager as described in the Service Information.(79) Procedure has the meaning given to it in ISO 9000.(80) Process has the meaning given to it in ISO 9000.(81) Prospective Tenderer is any person or corporate body whoapplies to be included on a tender list to become anIncoming Contractor.(82) RCC is the Employer’s Regional Control Centre.(82a)(82b)(82c)The Regional Technology Network is the part of themotorway and trunk road network and the associatedbuildings, infrastructure and amenities for which theEmployer is responsible which are within the areaboundaries identified in the Network Information, unlesslater changed in accordance with this contractRoutine Maintenance Plan is the Accepted PlanQuality Management Points has the meaning set out inclause Z17.8 and operated in accordance with clause Z17(83) Quality Plan has the meaning given to it in ISO 9000.(84) Quality Statement is the statement of that name referred toin the Contract Data Part Two detailing the Contractor’sproposals for the management and resourcing of theservice.(84a) Quality Table is the table in clause Z17.14(84b)‘Second line’ maintenance involves swapping of modules orrepairs of equipment at the Contractor’s Premises.(85) Not Used(86) SRW is the Employer’s Scheduled Roadworks database.RTMC CoC, Issue 1, Rev 0 July 2011

Regional Technology Maintenance <strong>Contract</strong><strong>Conditions</strong> <strong>of</strong> <strong>Contract</strong>• from that information or• from that information combined with other details in (orlikely to come into) the possession <strong>of</strong> the Employer.(78) Premises means the facilities provided by the ServiceManager as described in the Service Information.(79) Procedure has the meaning given to it in ISO 9000.(80) Process has the meaning given to it in ISO 9000.(81) Prospective Tenderer is any person or corporate body whoapplies to be included on a tender list to become anIncoming <strong>Contract</strong>or.(82) RCC is the Employer’s Regional Control Centre.(82a)(82b)(82c)The Regional Technology Network is the part <strong>of</strong> themotorway and trunk road network and the associatedbuildings, infrastructure and amenities for which theEmployer is responsible which are within the areaboundaries identified in the Network Information, unlesslater changed in accordance with this contractRoutine Maintenance Plan is the Accepted PlanQuality Management Points has the meaning set out inclause Z17.8 and operated in accordance with clause Z17(83) Quality Plan has the meaning given to it in ISO 9000.(84) Quality Statement is the statement <strong>of</strong> that name referred toin the <strong>Contract</strong> Data Part Two detailing the <strong>Contract</strong>or’sproposals for the management and resourcing <strong>of</strong> theservice.(84a) Quality Table is the table in clause Z17.14(84b)‘Second line’ maintenance involves swapping <strong>of</strong> modules orrepairs <strong>of</strong> equipment at the <strong>Contract</strong>or’s Premises.(85) Not Used(86) SRW is the Employer’s Scheduled Roadworks database.<strong>RTMC</strong> CoC, Issue 1, Rev 0 July 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!