RTMC Model Conditions of Contract - Highways Agency
RTMC Model Conditions of Contract - Highways Agency RTMC Model Conditions of Contract - Highways Agency
Regional Technology Maintenance ContractConditions of Contractthe Contractor.(66) NLA is The Newspaper Licensing Agency Limited.(67) Nonconformity has the meaning given to it in ISO 9000.(68) NRTS Co. is the National Roads TelecommunicationsServices Company employed by the Employer.(69) NTIS is the Employer’s National Traffic Information Service.(70) Original Scheme means the Local Government PensionScheme or such other public service pension scheme aswas applicable.(71) Operational Performance Indicators are measures ofperformance of part of the service in respect of safety,Department of Transport indicators, integrated assetmanagement, asset maintenance, Scheme development,cost, time Efficiency Improvements and Innovation,customer service, quality management, sustainability, andease of doing business with for which thresholds, targetsand/or weightings will be set by the Employer on or beforethe access date.(72)Not Used.(73) Not Used(74) Outgoing Contractor is any agent or contractor appointedby the Employer or Others to carry out works or provideservices similar to the service in relation to the AffectedProperty and/or the Traffic Technology Systems during theperiod immediately prior to the access date.(75) Outgoing Contractor’s Pension Scheme is the registeredpension scheme or schemes operated by an OutgoingContractor immediately prior to the access date which hasbeen certified by the Government Actuary’s Department asproviding benefits which are broadly comparable to thoseprovided by the Original Scheme.(76) Not Used.(77)Personal Data is information received by the Contractor inrelation to this contract, which relates to living individualswho can be identifiedRTMC CoC, Issue 1, Rev 0 July 2011
Regional Technology Maintenance ContractConditions of Contract• from that information or• from that information combined with other details in (orlikely to come into) the possession of the Employer.(78) Premises means the facilities provided by the ServiceManager as described in the Service Information.(79) Procedure has the meaning given to it in ISO 9000.(80) Process has the meaning given to it in ISO 9000.(81) Prospective Tenderer is any person or corporate body whoapplies to be included on a tender list to become anIncoming Contractor.(82) RCC is the Employer’s Regional Control Centre.(82a)(82b)(82c)The Regional Technology Network is the part of themotorway and trunk road network and the associatedbuildings, infrastructure and amenities for which theEmployer is responsible which are within the areaboundaries identified in the Network Information, unlesslater changed in accordance with this contractRoutine Maintenance Plan is the Accepted PlanQuality Management Points has the meaning set out inclause Z17.8 and operated in accordance with clause Z17(83) Quality Plan has the meaning given to it in ISO 9000.(84) Quality Statement is the statement of that name referred toin the Contract Data Part Two detailing the Contractor’sproposals for the management and resourcing of theservice.(84a) Quality Table is the table in clause Z17.14(84b)‘Second line’ maintenance involves swapping of modules orrepairs of equipment at the Contractor’s Premises.(85) Not Used(86) SRW is the Employer’s Scheduled Roadworks database.RTMC CoC, Issue 1, Rev 0 July 2011
- Page 1 and 2: Highways AgencyRegional Technology
- Page 3 and 4: Regional Technology Maintenance Con
- Page 5 and 6: Regional Technology Maintenance Con
- Page 7 and 8: Regional Technology Maintenance Con
- Page 9 and 10: Regional Technology Maintenance Con
- Page 11 and 12: Regional Technology Maintenance Con
- Page 13 and 14: Regional Technology Maintenance Con
- Page 15: Regional Technology Maintenance Con
- Page 19 and 20: Regional Technology Maintenance Con
- Page 21 and 22: Regional Technology Maintenance Con
- Page 23 and 24: Regional Technology Maintenance Con
- Page 25 and 26: Regional Technology Maintenance Con
- Page 27 and 28: Regional Technology Maintenance Con
- Page 29 and 30: Regional Technology Maintenance Con
- Page 31 and 32: Regional Technology Maintenance Con
- Page 33 and 34: Regional Technology Maintenance Con
- Page 35 and 36: Regional Technology Maintenance Con
- Page 37 and 38: Regional Technology Maintenance Con
- Page 39 and 40: Regional Technology Maintenance Con
- Page 41 and 42: Regional Technology Maintenance Con
- Page 43 and 44: Regional Technology Maintenance Con
- Page 45 and 46: Regional Technology Maintenance Con
- Page 47 and 48: Regional Technology Maintenance Con
- Page 49 and 50: Regional Technology Maintenance Con
- Page 51 and 52: Regional Technology Maintenance Con
- Page 53 and 54: Regional Technology Maintenance Con
Regional Technology Maintenance <strong>Contract</strong><strong>Conditions</strong> <strong>of</strong> <strong>Contract</strong>• from that information or• from that information combined with other details in (orlikely to come into) the possession <strong>of</strong> the Employer.(78) Premises means the facilities provided by the ServiceManager as described in the Service Information.(79) Procedure has the meaning given to it in ISO 9000.(80) Process has the meaning given to it in ISO 9000.(81) Prospective Tenderer is any person or corporate body whoapplies to be included on a tender list to become anIncoming <strong>Contract</strong>or.(82) RCC is the Employer’s Regional Control Centre.(82a)(82b)(82c)The Regional Technology Network is the part <strong>of</strong> themotorway and trunk road network and the associatedbuildings, infrastructure and amenities for which theEmployer is responsible which are within the areaboundaries identified in the Network Information, unlesslater changed in accordance with this contractRoutine Maintenance Plan is the Accepted PlanQuality Management Points has the meaning set out inclause Z17.8 and operated in accordance with clause Z17(83) Quality Plan has the meaning given to it in ISO 9000.(84) Quality Statement is the statement <strong>of</strong> that name referred toin the <strong>Contract</strong> Data Part Two detailing the <strong>Contract</strong>or’sproposals for the management and resourcing <strong>of</strong> theservice.(84a) Quality Table is the table in clause Z17.14(84b)‘Second line’ maintenance involves swapping <strong>of</strong> modules orrepairs <strong>of</strong> equipment at the <strong>Contract</strong>or’s Premises.(85) Not Used(86) SRW is the Employer’s Scheduled Roadworks database.<strong>RTMC</strong> CoC, Issue 1, Rev 0 July 2011