13.07.2015 Views

Pest and Weed Management Plan - QGC

Pest and Weed Management Plan - QGC

Pest and Weed Management Plan - QGC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pest</strong> <strong>and</strong> <strong>Weed</strong> <strong>Management</strong> <strong>Plan</strong>Rev 0May 2011• If the construction area is located over a number of properties, the FEO will make arecommendation in the relevant site environmental approval if machinery will need to be cleaneddown when moving between properties.• Local Borrow Pits will be utilised in the construction of site infrastructure earthworks. Location ofthe Borrow Pits will consider weed dispersal issues.• Topsoil from Borrow Pits will be stockpiled for use in site rehabilitation <strong>and</strong> any weeds controlledbefore transportation to other sites.• Prior to importing bulk materials <strong>and</strong> products, including earthworks fill, <strong>QGC</strong> will confirm withsuppliers the weed status of materials by requesting a written statement i.e. weed hygienedeclaration form as per guidelines set out below.DrillingDuring drilling operations the following steps must be taken:• Drilling rigs <strong>and</strong> associated vehicles <strong>and</strong> equipment will require clean-down if advised by a FEO,or if the contractor is aware the rig has been operating in a weed risk area.• External contractors must provide the <strong>QGC</strong> Rig Drilling Supervisor with appropriatedocumentation to verify that vehicles <strong>and</strong> equipment have been cleaned before entering <strong>QGC</strong>leases.Pipeline ConstructionDuring survey mark-up, clear <strong>and</strong> grade, trenching <strong>and</strong> rehabilitation, the following steps must be taken:• Site environmental clearances will follow the same procedure as for pegging parties.• During the clear <strong>and</strong> grade, earthworks machinery <strong>and</strong> any vehicles entering the right of waymust be cleaned prior to entering <strong>and</strong> upon completion of works. All machinery arriving at<strong>QGC</strong>‟s right of way for clear <strong>and</strong> grade must be accompanied by a weed free declaration <strong>and</strong>should be inspected by <strong>QGC</strong> FEOs prior to works commencing.• Once clear <strong>and</strong> grade of the right of way is complete, „Clean on Entry‟ points (COE) will beestablished along the right of way. Marked by signs, these will be the only access points formachinery <strong>and</strong> vehicles during pipeline trenching <strong>and</strong> construction. Machinery <strong>and</strong> vehiclesmust use COE <strong>and</strong> as long as they do not leave the right of way, gravel roads or sealed roads<strong>and</strong> it has not rained, they will not require rewashing. COE will be located at points that interceptgravel or sealed roads so that minimal rewashing will be required. If a COE point is requiredaway from gravel or sealed roads, the access track will be constructed in such a way thatminimal rewashing will be required.Rehabilitation Works16 of 100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!