13.07.2015 Views

Vectrostar 02ENU750 User's manual

Vectrostar 02ENU750 User's manual

Vectrostar 02ENU750 User's manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3. Final adjustmentYour preliminary adjustmentis OKAdd concentrate electrolyteR25 : 1 dose - R65 : 2 dosesR120 : 4 doses - R200 : 8 doses- Switch off the power- Turn on the starterThe pump run for the maximum time- Switch off the starter- Switch on the power- Turn on the starterUr < 6% Ur written- Continue the testUr > 6% Ur written- StopWait for Ur stopping growing- Note starting time- StopAdjustment for SQUIRREL CAGE MOTOR :1. Valves and time relayFlow valve (hare – turtle) : R65 Step 9R120/200 Max (lièvre) minus 2 turnsRecycling valve : R65 Repère 5R120/200 Entre repères 3 et 4Time relay :Max (around 100 seconds)2. Preliminary adjustmentThis adjustment consists on several short time tests that avoid the electrolyte to heat. The goalof this step is to reach the preliminary current Ip of the machine. Use a voltmeter, achronometer and the dosing bottle.IMPORTANT : The motor must be loaded like in real conditions.Doc N° : 02ENU75File :<strong>02ENU750</strong>Rev : 0Date : 22/12/06Written by: M. ParthiotChecked by: F.Lavogiez Page : 10 / 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!