13.07.2015 Views

SkyView - Dynon Avionics

SkyView - Dynon Avionics

SkyView - Dynon Avionics

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

17. Appendix C: Wiring and Electrical Connections<strong>SkyView</strong> utilizes standardized network connectors and wire harnesses forequipment-to-equipment connections as well as other connections. Installersshould rarely have to build custom wire harnesses. This appendix is included as areference for those rare times when custom wiring is required.Improper wiring can result in permanent damage to your instrument and/or theaccompanying sensors.Make all connections to your harness before plugging it into any of thecomponents of the system. Do not make connections while power is applied atany point in the system.Wire GaugeUnless otherwise specified, 22 AWG wire is normally sufficient for the power supply and groundlines, but we recommend that you consult a wire sizing chart to determine the size required forthe wire routing in your particular aircraft. Ensure that the power lines include a circuit breakeror an appropriately sized fuse for the wire you select.Smaller gauge wire is sufficient for lines that only carry data.FAA Advisory Circular AC 43.13-1B is an excellent resource for wire sizing requirements as wellas other acceptable methods, techniques, and practices in aircraft inspection and repair.GroundingMany of the engine sensors require a connection to a ground on the SV-EMS-220. There aremany places on an aircraft where you could connect these sensors. However, the ideal locationto ground these sensors is to one of the SV-EMS-220 ground pins. Connecting the sensor’sground pin directly to the SV-EMS-220 minimizes any voltage difference between sensorground and SV-EMS-220 ground.You can measure the voltage difference between grounds to check if theconnection has a minimal voltage drop. Set a multimeter to the DC voltages settingand place one probe tip on one ground and place the other probe tip on the other.Measurements close to 0 mV (within 5 mV) are, in most cases, acceptable.Other grounding recommendations include:Ensure that solid, thick electrical connections exist between engine and battery ground.Do not paint over surfaces that are ground connection points.<strong>SkyView</strong> System Installation Guide - Revision J 17-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!