Beispiel einer I&A Analyse mit ISA-95 - HGP AG
Beispiel einer I&A Analyse mit ISA-95 - HGP AG
Beispiel einer I&A Analyse mit ISA-95 - HGP AG
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>ISA</strong> <strong>95</strong> - Functional Hierarchy Model<br />
Level 4<br />
Level 3<br />
Level 2<br />
Level 1<br />
Level 0<br />
www.hgp.ag<br />
Batch<br />
Control<br />
Business Planning<br />
& Logistics<br />
Plant Production<br />
Scheduling, Operational<br />
Management, etc<br />
Manufacturing<br />
Operations Mgmt.<br />
Dispatching Prod.,<br />
Detailed Production<br />
Scheduling, ...<br />
Continuous<br />
Control<br />
Discrete<br />
Control<br />
Establishing the basic plant schedule -<br />
production, material use, delivery, and<br />
shipping. Determining inventory levels.<br />
ERP (SAP)<br />
Work flow control to produce the desired<br />
end products. Maintaining records and<br />
optimizing the production process.<br />
MES, LIMS, WMS<br />
Monitoring, supervisory control and<br />
automated control of the production<br />
process<br />
SCADA, DCS<br />
Sensing the production process,<br />
manipulating the production process<br />
The actual production process<br />
Months,<br />
weeks,<br />
days<br />
Days,<br />
shifts,<br />
hours,<br />
minutes,<br />
seconds<br />
Hours,<br />
minutes,<br />
seconds<br />
6