03.12.2012 Views

Beispiel einer I&A Analyse mit ISA-95 - HGP AG

Beispiel einer I&A Analyse mit ISA-95 - HGP AG

Beispiel einer I&A Analyse mit ISA-95 - HGP AG

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ISA</strong> <strong>95</strong> - Functional Hierarchy Model<br />

Level 4<br />

Level 3<br />

Level 2<br />

Level 1<br />

Level 0<br />

www.hgp.ag<br />

Batch<br />

Control<br />

Business Planning<br />

& Logistics<br />

Plant Production<br />

Scheduling, Operational<br />

Management, etc<br />

Manufacturing<br />

Operations Mgmt.<br />

Dispatching Prod.,<br />

Detailed Production<br />

Scheduling, ...<br />

Continuous<br />

Control<br />

Discrete<br />

Control<br />

Establishing the basic plant schedule -<br />

production, material use, delivery, and<br />

shipping. Determining inventory levels.<br />

ERP (SAP)<br />

Work flow control to produce the desired<br />

end products. Maintaining records and<br />

optimizing the production process.<br />

MES, LIMS, WMS<br />

Monitoring, supervisory control and<br />

automated control of the production<br />

process<br />

SCADA, DCS<br />

Sensing the production process,<br />

manipulating the production process<br />

The actual production process<br />

Months,<br />

weeks,<br />

days<br />

Days,<br />

shifts,<br />

hours,<br />

minutes,<br />

seconds<br />

Hours,<br />

minutes,<br />

seconds<br />

6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!