6.11.8 Construction and Renovation <strong>of</strong> existing Office-cum-Residential Buildings <strong>of</strong> CBIDuring the year following approvals were conveyed for construction/renovation <strong>of</strong> various <strong>of</strong>fice complexes/residential quarters:Sl. Name <strong>of</strong> the Amount Details <strong>of</strong> workNo Branch1 ACB Lucknow Rs. 7.26 lac Construction <strong>of</strong> boundary wall and Viraj Khand Gomatinagar,Lucknow.2 ACB Port Blair Rs. 10.6 lac Work <strong>of</strong> internal partitions in newly-allotted space in GPOAthrough CPWD.3 CBI Academy Rs. 3.7 crore Renovation <strong>of</strong> Officers and Trainees’ Hostel.4 ACB Lucknow Rs. 22.29 lac Construction <strong>of</strong> Boundary Wall for the land at Jankipuram.5 ACB Mumbai Rs. 4.0 lac Civil and Electrical works associated with TAFSU.6 Vasant Vihar Rs. 1.72 crore Payment for upgradation <strong>of</strong> 90 quarters at CBI Colony, VasantVihar, New Delhi.7 ACB Imphal Rs. 3.05 lac Installation <strong>of</strong> Tube Well at Imphal.8 ACB Bangalore Rs. 5.91 lac Providing <strong>of</strong> workstation for TAFSU, Bangalore.9 Vasant Vihar Rs. 33.38 lac Electrical work in 90 quarters at Vasant Vihar, New Delhi.10 ACB Jaipur Rs. 4.99 lac Providing <strong>of</strong> vitrified tiles flooring in the <strong>of</strong>fice <strong>of</strong> Jaipur.11 ACB Port Blair Rs. 12.7 lac Providing <strong>of</strong> furniture to CBI Office.12 ACB Cochin Rs. 33.03 lac Installation <strong>of</strong> one Passenger lift in the <strong>of</strong>fice.13 ACB Dehradun Rs. 3.50 lac Towards installation <strong>of</strong> compactor in the Malkhana.14 ACB Mumbai Rs. 34.55 lac Towards structural repair <strong>of</strong> aesthetic improvement and upgradation<strong>of</strong> CBI quarters.15 AHD Patna Rs. 1.67 crore Construction <strong>of</strong> <strong>of</strong>fice complex.16 ACB Cochin Rs. 4.33 lac Construction <strong>of</strong> shades over balcony <strong>of</strong> staff quarters.17 ACB Bangalore Rs. 9.08 lac Renovation <strong>of</strong> reception area, counter and main door & entrancegate.18 ACB Jaipur Rs. 2.23 lac Installation & testing <strong>of</strong> new submersible pump.19 ACB Jaipur Rs. 10.99 lac Construction <strong>of</strong> temporary parking shed and reconstruction <strong>of</strong>Duty Room at Jaipur.20 ACB Jaipur Rs. 1.47 lac Raising the boundary wall and re-fixing grill.21 ACB Mumbai Rs. 12.65 lac Upgradation and alteration <strong>of</strong> internal 20 quarters Type-II atMumbai.22 ACB Kolkata Rs. 9.97 lac Renovation <strong>of</strong> <strong>of</strong>fice premises <strong>of</strong> ACB Kolkata and Zonal Officeat 14th and 15th floor MOS Building, Nizam Place, Kolkata.23 ACB Kolkata Rs. 7.0 lac Renovation <strong>of</strong> <strong>of</strong>fice premises <strong>of</strong> TAFSU, Kolkata at 14th floorMOS Building, Nizam Place, Kolkata.24 ACB Kolkata Rs. 32.21 lac Renovation <strong>of</strong> <strong>of</strong>fice premises <strong>of</strong> TAFSU, Kolkata at 14th floorMOS Building, Nizam Place, Kolkata.25 ACB Kolkata Rs. 9.66 lac Wiring for light points, fan points, call bell points computer points,A/C points in recessed steel conduit system, energy-efficient fittings,LAN connection Air-conditioner and fire alarm systems, etc. at13th floor MOS Building, Nizam Place, Kolkata.26 ACB Guwahati Rs. 23.43 crore Construction <strong>of</strong> <strong>of</strong>fice-cum-residential complex at Guwahati.74 Annual Report 2011 | <strong>Central</strong> <strong>Bureau</strong> <strong>of</strong> <strong>Investigation</strong>
Glimpses <strong>of</strong> CBI InfrastructureShri Amar Pratap Singh, Director, CBI, at CBI Gymnasium, New DelhiCanteen at CBI HQ Building, New DelhiMedia Briefing Hall at CBI HQ Building, New DelhiCBI Office Building at Mumbai (under construction)CBI Office Building at Jabalpur (under construction)Human Resource & Budget | Industry, Impartiality and Integrity 75
- Page 4 and 5:
2 Annual Report 2011 | Central Bure
- Page 7 and 8:
Chapter-1CBIAN OVERVIEWCBI - An Ove
- Page 9 and 10:
The Head of the Special Police Sect
- Page 11 and 12:
Resolution dated 1st April, 1963 wi
- Page 13 and 14:
well as economic offences. Bank Fra
- Page 15 and 16:
Chapter-2CRIME INVESTIGATIONWORKCri
- Page 17 and 18:
2.2.2 Some of the importantcases re
- Page 19 and 20:
Against an Income Tax Officer,for p
- Page 21 and 22:
Licensee for Merchandising andOn-li
- Page 23 and 24:
Secretary (Telecom), Departmentof T
- Page 25 and 26:
ate of interest on Rs.500 crore.(PE
- Page 27 and 28:
2.3.2 A total of 828 cases/enquirie
- Page 29 and 30: 2.3.5 Some of the Notablecharge-she
- Page 31 and 32: Against the then CMD, SECL,Departme
- Page 33 and 34: Chapter-3PROSECUTIONProsecution | I
- Page 35 and 36: 30-01-1997 and further revisedvide
- Page 37 and 38: Status of Establishment of Special
- Page 39 and 40: 3.15.2 10022 trials were pending in
- Page 41 and 42: to undergo RI for one year witha fi
- Page 43 and 44: years with a fine of Rs.20,000/- fo
- Page 45 and 46: Chapter-4POLICY DIVISIONPolicy Divi
- Page 47 and 48: Shri V. Narayanasamy, presenting th
- Page 49 and 50: 4.4 BEST SUPPORT STAFF AWARD4.4.1 C
- Page 51 and 52: Shri Ishwar Singh,SI, CBI, EO-I,New
- Page 53 and 54: Shri Mahesh Kumar Puri,Dy.SP, CBI,
- Page 55 and 56: 4.6 DsGP/IsGP CONFERENCE4.6.1 The D
- Page 57 and 58: Chapter-5INTERNATIONALPOLICE COOPER
- Page 59 and 60: Forces and other Law Enforcement Ag
- Page 61 and 62: Resolutions adopted during thePolic
- Page 63 and 64: 5.5.4 Mr. David M. Luna, Director,
- Page 65 and 66: 9th SAARC Conference in Police Matt
- Page 67 and 68: Chapter-6HUMAN RESOURCE &BUDGETHuma
- Page 69 and 70: 6.2 PROMOTION AND CONFIRMATION6.2.1
- Page 71 and 72: Sl. No. S/Shri Date of promotion8 V
- Page 73 and 74: 6.5.1 Inductions were also made on
- Page 75 and 76: Sl.No.Rank Event of leaving No. of
- Page 77 and 78: Glimpses of CBI Headquarters, New D
- Page 79: Hon’ble Prime Minister Dr. Manmoh
- Page 83 and 84: 6.13 WELFARE6.13.1 During the year
- Page 85 and 86: Chapter-7HUMAN RESOURCEDEVELOPMENTH
- Page 87 and 88: (ii)5 days of regular course. Some
- Page 89 and 90: 7.7 BASIC TRAINING7.7.1 During the
- Page 91 and 92: Director, CBI, laying the foundatio
- Page 93 and 94: Academic Advisory Board Meeting in
- Page 95 and 96: Library at CBI Academy, GhaziabadSp
- Page 97 and 98: Mr. Ronald K. Noble, Secretary-Gene
- Page 99 and 100: ANNEXURESAnnexures | Industry, Impa
- Page 101 and 102: A3: VACANCY POSITION AT A GLANCE -
- Page 103 and 104: A5: VACANCY POSITION AT A GLANCE -
- Page 105 and 106: 15. Emergency Provisions (Continuan
- Page 107 and 108: C. STATE ACTSOffences punishable un
- Page 109 and 110: Sl.NoName of theCourse12 Investigat
- Page 111 and 112: Sl.NoName of theCourseParticipants
- Page 113 and 114: Sl.NoName of theCourse49 Specialize