13.07.2015 Views

Download - Central Bureau of Investigation

Download - Central Bureau of Investigation

Download - Central Bureau of Investigation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6.11 BUILDINGS6.11.1 CBI HO BuildingThe new CBI Headquarters Building is a modern,state-<strong>of</strong>-the-art, centrally air-conditioned buildinghaving two basements and ground plus 11 floors, whichhas been constructed by the NBCC in a period <strong>of</strong> 36months at a total cost <strong>of</strong> Rs.201.10 crore. This buildingwas inaugurated by the Hon’ble Prime Minister <strong>of</strong>India Dr. Manmohan Singh on 30.04.2011. Thebuilding houses all Delhi-based Offices <strong>of</strong> CBI, whichincludes AC Headquarters, Special Crime, EconomicOffences, ACB Delhi, BS&FC, STF, MDMA,INTERPOL, Administration Division, Directorate<strong>of</strong> Prosecution, Chief Information Officer, VigilanceCell and also the Office <strong>of</strong> Pay & Accounts Officer,CBI, New Delhi. It has CBI Gallery, Gymnasium,Press Briefing Room, Cafeteria, Guest Rooms, etc.It is an energy-efficient building having rainwaterharvesting, solar heating system and also has ownsewerage treatment plant with provision <strong>of</strong> recycling<strong>of</strong> treated water for horticulture use. The building isequipped with state-<strong>of</strong>-the-art fire-fighting system as perlatest national building code. It has energy conservingHVAC system for power back-up facility. Workstationsand cabins with glass partitions, compactors have beenprovided on each floor.6.11.2 CBI ART GALLERYCBI Gallery depicts the history <strong>of</strong> CBI, importantcases handled by the organisation and articles recoveredin important cases. The gallery was inaugurated byHon’ble Prime Minister <strong>of</strong> India on 30.04.2011.6.11.3 GYMNASIUM AT CBI HQ BUILDINGThe Gymnasium has been made functional on groundfloor <strong>of</strong> CBI HQ Building. It has been equipped withstate-<strong>of</strong>-the-art gymnasium equipments.6.11.4 CANTEENA cafeteria on ground floor is presently run byIRCTC.6.11.5 PRESS BRIEFING ROOMA well-designed Press briefing room and Media loungeis functional at the ground floor.6.11.6 OTHER BUILDINGSThe CBI has undertaken other projects for theconstruction <strong>of</strong> <strong>of</strong>fice-cum-residential complex at variousplaces, which includes <strong>of</strong>fice complex in Bandra-KurlaComplex at Mumbai, <strong>of</strong>fice-cum-residential complex atJabalpur, <strong>of</strong>fice-cum-residential complex at Imphal and<strong>of</strong>fice-cum-residential complex at Guwahati.6.11.7 Sanction <strong>of</strong> the Government has been obtainedfor making payment to Dy. Commissioner, Papumpari,Yupia towards allotment <strong>of</strong> 3750 sq.mtrs. <strong>of</strong> land forconstruction <strong>of</strong> CBI <strong>of</strong>fice-cum-residential complex atItanagar. Payment has been made and possession hasbeen taken <strong>of</strong> the land.Shri Amar Pratap Singh, Director, CBI, along with other Senior Officers <strong>of</strong> CBI on the occasion <strong>of</strong>superannuation <strong>of</strong> Shri S.P. Singh, Joint Director, CBI72 Annual Report 2011 | <strong>Central</strong> <strong>Bureau</strong> <strong>of</strong> <strong>Investigation</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!