Appendix DPublic Submission ReviewSubmission Discussion ConclusionIssue 1: Access/Traffic1.1 Nicole Banich, 56 Apple Tree Cres.Has anyone checked “theimpact <strong>of</strong> having a street comeon to Oakside, which is up aslope and a slight bend? Thiswill be a hazard, particularlywith winter conditions..”“if there is to be constructionwhere are all the cars, trucksand vans <strong>of</strong> the workers goingto park? On Oakside andMapleBrook, making driving anightmare through that area.”<strong>The</strong> <strong>Township</strong>’s engineeringconsultants have reviewed thetraffic submissions includinginformation on sight lines andare satisfied with the proposedaccess.<strong>The</strong> issue <strong>of</strong> construction trafficcan be controlled by the<strong>Township</strong> to minimize impactson the residents.1.2 David Pilote and Charlene Summerfield, 14 Cyril Richardson Court“<strong>The</strong> number <strong>of</strong> housesproposed are too many forsuch a small area and thetraffic onto the existing road(Oakside Drive) was notdesigned for this.”See 1.1 See 1.11.3 Eileen and Chris Ethier, 12 Cyril Richardson Court“<strong>The</strong> following issues concernus and should be fully addressbefore or if this developmentis permitted...See 1.1 See 1.1traffic/safety issueregarding proposed roadlocation”1.4 Patrick Oliver, 10 Cyril Richardson Court“Increase <strong>of</strong> traffic at least 32cars in and out daily! <strong>The</strong>existing street is already verybusy.See 1.1 See 1.12. Drainage2.1 Nicole Banich, 56 Apple Tree Cres.-“<strong>The</strong> city still has notaddressed the conditions <strong>of</strong> thebackyards on Apple Tree.Because the street slopes,those yards are breeding<strong>The</strong> developer has prepared astormwater management reportwhich addresses drainage issues.<strong>The</strong> <strong>Township</strong> engineeringconsultant is satisfied with theProposed access is consideredappropriate by <strong>Township</strong>’sengineering consultant.That approval <strong>of</strong> aconstruction trafficmanagement plan be acondition <strong>of</strong> approval.<strong>The</strong> drainage issue will befurther reviewed as part <strong>of</strong>detailed design through theapproval <strong>of</strong> the draft plan <strong>of</strong>condominium.D-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!