13.07.2015 Views

VRIOGS 010.7 RevA - Public Transport Victoria

VRIOGS 010.7 RevA - Public Transport Victoria

VRIOGS 010.7 RevA - Public Transport Victoria

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>VRIOGS</strong> <strong>010.7</strong> Revision A 23bond conductance and expected maximum operating voltage and current shallbe calculated by the Traction System Engineer.2. The Signal Engineer is responsible for the connection of the electrolysisbonds to rail at the specified locations and all work shall be undertaken to hissatisfaction.6.7.2 LocationElectrolysis bond connections shall be made to a convenient traction current returnconductor close to the Power Supply Authority’s electrolysis bond. The electrolysisbond should not be more than 50 m from the rail connection. Suitable connectionpoints are:1. Existing impedance bond neutral point connections,2. The traction rail of any single rail track circuit and3. Either rail of a non-track circuited track used for normal traction currentreturn.6.7.3 ConnectionFor double rail track circuits the impedance bond shall be connected in accordancewith this specification.Connection to a single rail track circuit shall be in accordance with this specification.6.8 Spark Gap Protective Devices6.8.1 GeneralSpark Gap Protective Devices must be provided to all structures supporting orattached in any manner to the overhead traction supply. They are there to protectagainst electric shock in the event of an insulator failing and rendering the structure“live” at traction voltage. The spark gap is connected to the steel overhead structureat approximately 1500 mm above rail level via a hole drilled into the overheadstructure and then assembled in accordance to "Spark Gap Earthing Device" PlanNo. STD_G0070.6.8.2 InstallationThe spark gap device shall be installed as per the following;1. The Constructor shall provide the spark gap device and install the cable toconnect from the spark gap to the rail, which shall only be connected to thetraction return rail to the satisfaction of the Signal Engineer.2. Should spark gaps be required at locations where they are necessary to beinstalled on concrete; or other than steel structures, such as a concrete bridgepier supporting an over rail bridge where the electrical traction lines areconnected to fittings on the underside of the bridge the following should becomplied to. In these circumstances the Traction System Engineer shallsupply and install a PVC sheathed cable from the overhead insulator to theNOTE: This document is controlled only when viewed on the DOT Engineering Standards website.Any other copy of this document is uncontrolled, and the content may not be current.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!