13.07.2015 Views

09 - Sea-Doo.net

09 - Sea-Doo.net

09 - Sea-Doo.net

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section <strong>09</strong> PROPULSION SYSTEMSubsection 02 (JET PUMP)INSTALLATIONNOTE: It is recommended to apply Right StuffGasket at a temperature within 5-27°C (40-80°F).Apply a 6 mm (1/4 in) thick seam of Right StuffGasket (P/N 293 800 053) on ride shoe while payingclose attention to the routing shown on thefollowing illustration.REMOVAL FOR TWIN-PUMPMODELSNOTE: The ride shoes and jet pump supports aredifferent on port and starboard (LH/RH).Tools Required– 2 pry bars, approx. 46 cm (19 in) in length– phillips head screwdriver– hammer– scraperNOTE: Jet pump and intake grill do not need to beremoved. Lower intake grill with the weedlesssystem lever.Remove six bolts that are retaining ride shoe tohull.The ride shoe is assembled to the hull with boltsinstead of screws. You will need a person to holdthe nuts from the bilge while removing the boltsunder the hull. The nuts are located each side ofthe water channel at the back.F04J3VAInstall ride shoe on boat within 3-4 minutes afterhaving applied Right Stuff Gasket.Apply Adseal 4511 (P/N 293 800 033) to ride shoescrew threads.Install screws and torque to 10 N•m (88 lbf•in).Remove remaining sealant from intake.Reinstall jet pump as described earlier in this section.- CAUTIONAllow sealant to cure 12 hours when usingRight Stuff Gasket before putting boat in water.Test run boat.F04L4UANOTE: It may be necessary to heat ride shoe inorder to remove it.Insert pry bars between hull and ride shoe.Tap ends of pry bars gently and alternately untilthe sealant bond breaks.<strong>09</strong>-02-25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!