13.07.2015 Views

Emer-Band TDS - Parchem

Emer-Band TDS - Parchem

Emer-Band TDS - Parchem

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Emer</strong>-<strong>Band</strong>The 200 mm width should be used where the condition ofthe concrete is such that porosity adjacent or close to thejoint edges is suspect, where the joint is excessively wideor misaligned and when the <strong>Emer</strong>-<strong>Band</strong> is to bepermanently immersed.JOINT PREPARATIONExpansion joints must be packed with a firm, consolidatedjoint filler, such as Hydrocell, prior to laying the <strong>Emer</strong>-<strong>Band</strong>system. If necessary joints may be pre-sealed using anelastomeric sealant prior to laying the <strong>Emer</strong>-<strong>Band</strong> system.Ensure that any sealant used is capable of accommodatingthe anticipated joint movement. Where <strong>Emer</strong>-<strong>Band</strong> is to beturned up parapets and the like, a splay should be providedeither cast in-situ or formed with Nitomortar AP so that thechange in direction is smooth and progressive.SURFACE PREPARATIONConcrete surfaces onto which the <strong>Emer</strong>-<strong>Band</strong> is to be laidmust be sound and dust free, with no frost or free surfacewater. New concrete must be fully cured and free fromcuring compound. The concrete surface ideally should bewood float finished for the width of the <strong>Emer</strong>-<strong>Band</strong> and freefrom irregularities, with well defined arises and no verticalmisalignment between each side of the joint.Prepare a suitable width of substrate slightly wider than themembrane width selected. Sharp arises should be grounddown pencil round.Remove all dirt, dust and laitance by rigorous wirebrushing, grit blasting or grinding. Any spalling orhoneycombing must be repaired using Nitomortar AP resinmortar and allowed to harden prior to the application of the<strong>Emer</strong>-<strong>Band</strong> system. If the concrete is wetter than SaturatedSurface Dry (SSD), dry it gently with a gas torch or hot airblower.If required, a maximum 25 mm width of bond breaker tapeapplied adjacent to either areas will provide an increasedunbonded width and greater movement potential ifrequired.PRIMINGFor most concrete applications use of a primer isunnecessary, however in cases where <strong>Emer</strong>-<strong>Band</strong> is beingused on other substrates i.e. steel, fired clay bricks etc, aprimer may be required. Please call your local <strong>Parchem</strong>sales office for further information.WELDING<strong>Emer</strong>-<strong>Band</strong> can be jointed by hot air welding to cater forany joint length. A electric hot air gun of the type used byvinyl flooring applicators is generally suitable for the task.The hot air gun should have a nozzle with a slot shapedoutlet to spread the hot air across a broad fan. This willallow for more effective bonding and prevent localised overheating and charring of the <strong>Emer</strong>-<strong>Band</strong> tape. Beforebonding, solvent wipe the two faces to be bonded withSolvent 10 and create an overlap of at least 40 mm. Theambient air temperature should be taken into account whenwelding by adjusting the welding speed to ensure that theHypalon is neither scorched or under-heated with no weldforming.Solvent welding of the Hypalon tape is an alternative to hotair welding, however solvent welding is slower because ofthe time required for the solvent to soften the tape to allowwelding. If required Solvent 10 can be used as a weldingsolvent.PREPARATION OF THE MEMBRANEThis operation is vital to the adhesion and performance ofthe <strong>Emer</strong>-<strong>Band</strong> system.When all substrate preparation has been carried out andthe joints are ready for application of the <strong>Emer</strong>-<strong>Band</strong>,measure and cut the length of <strong>Emer</strong>-<strong>Band</strong> to suit the joint.Carry out any welding of the <strong>Emer</strong>-<strong>Band</strong> tape as required tocater for the length of joint to be bonded during thisapplication session.Lay the <strong>Emer</strong>-<strong>Band</strong> with the bond face up on a cleansurface. Solvent wipe the bond face of the <strong>Emer</strong>-<strong>Band</strong> withSolvent 10 to activate the Hypalon for bonding. The solventwipe is essential in order to achieve adequate adhesion(refer section on Welding).MIXING AND APPLICATION OF THE ADHESIVENitomortar AP is a two part epoxy resin based adhesivedesigned for maximum bond strength with the <strong>Emer</strong>-<strong>Band</strong>Tape and is tolerant of damp concrete substrates.Transfer the entire contents of the hardener component intothe base component can and mix thoroughly using a slowspeed drill and spiral stirrer for a full 4 minutes stoppingoccasionally to scrape the sides of the tub. Mixing iscomplete when a uniform colour is achieved.Apply the adhesive onto the substrate using a spreader,making sure that an even spread of adhesive approximately2 mm thick is applied to an area wider that the <strong>Emer</strong>-<strong>Band</strong>tape. Once this has been done lay the solvent wiped, bondface of the <strong>Emer</strong>-<strong>Band</strong> tape onto the adhesive and align asrequired pressing it firmly over its full area ensuringcomplete contact. Finish along each edge of the <strong>Emer</strong>-<strong>Band</strong>tape with a small triangular fillet of adhesive and removeany excess.Membrane should be applied no more than 20 minutesafter wiping the bond face of the <strong>Emer</strong>-<strong>Band</strong> tape withSolvent 10. If the <strong>Emer</strong>-<strong>Band</strong> tape cannot be placed incontact with the adhesive within 20 minutes of solventwiping, it should be wiped again with Solvent 10immediately prior to placement.Allow the Nitomortar AP to cure for 3 to 48 hours beforeapplying a layer of Nitomortar AP along the edges of the3


<strong>Emer</strong>-<strong>Band</strong>top surface of the Hypalon tape. Application of the adhesiveserves to encapsulate the edges as shown in the diagramson page 2. Immediately after application of the adhesive tothe top face of the Hypalon tape, peel the green tape fromthe centre of the Hypalon to produce an even straight sidedepoxy fairing with no epoxy bridging the joint.LIMITATIONSJoint layouts incorporating <strong>Emer</strong>-<strong>Band</strong> to be kept as simpleas possible to allow for site joints to be restricted to straightbutt joints. Avoid complex changes of angle or skew givingrise to difficulty in jointing and installation.ESTIMATINGSUPPLY<strong>Emer</strong>-<strong>Band</strong>:widths:<strong>Emer</strong>-<strong>Band</strong>:widths:Nitomortar AP:Solvent 10:COVERAGENitomortar AP:1 mm thick, 25 m roll length100 & 200 mm, custom2 mm thick, 20 m roll lengthon request3 litre packs4 and 20 litre drumsApprox. 0.35 litres per metre perside - total 0.7 litres per metre.(35 mm bonded width withencapsulation @ 5 mm)Notes: coverage rates for liquid products are theoretical -due to wastage factors, variety and nature of possiblesubstrates, practical coverage figures may be reduced.STORAGEAll components must be stored in a cool dry location at atemperature between 5°C and 30°C.ADDITIONAL INFORMATION<strong>Parchem</strong> provides a wide range of complementary productswhich include:• concrete repair – cementitious and epoxy• grouts and anchors – cementitious and epoxy• waterproofing membranes – liquid applied,cementitious and bituminous sheet membranes• waterstops – pvc and swellable• joint sealants – building, civil and chemical resistant• industrial flooring systems – cementitious andepoxy• architectural coatings• filler boards – swellable cork, bituminous andbacking rod• ancillary productsFor further information on any of the above, please consultwith your local <strong>Parchem</strong> sales office.IMPORTANT NOTICEA Material Safety Data Sheet (MSDS) and Technical Data Sheet (<strong>TDS</strong>)are available from the <strong>Parchem</strong> website or upon request from thenearest <strong>Parchem</strong> sales office. Read the MSDS and <strong>TDS</strong> carefully priorto use as application or performance data may change from time totime. In emergency, contact any Poisons Information Centre (phone 1311 26 within Australia) or a doctor for advice.PRODUCT DISCLAIMERThis Technical Data Sheet (<strong>TDS</strong>) summarises our best knowledge of theproduct, including how to use and apply the product based on theinformation available at the time. You should read this <strong>TDS</strong> carefullyand consider the information in the context of how the product will beused, including in conjunction with any other product and the type ofsurfaces to, and the manner in which, the product will be applied. Ourresponsibility for products sold is subject to our standard terms andconditions of sale. <strong>Parchem</strong> does not accept any liability either directlyor indirectly for any losses suffered in connection with the use orapplication of the product whether or not in accordance with anyadvice, specification, recommendation or information given by it.PARCHEM CONCRETE REPAIR FLOORING JOINTING SYSTEMS WATERPROOFINGTECHNICAL DATA SHEET JANUARY 2010www.parchem.com.au 7 Lucca Road, Wyong NSW 2259 Sales 1800 801 108 Technical 1800 812 864 ABN 80 069 961 9684

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!