13.07.2015 Views

Brucejack and Snowfield Projects PDF - Minerals North

Brucejack and Snowfield Projects PDF - Minerals North

Brucejack and Snowfield Projects PDF - Minerals North

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WHY PRETIVM?Adjacent projects in northern British Columbia are delivering value through gold<strong>Snowfield</strong> ProjectBulk-tonnage presentslong-term value in gold1700RL1500RL1300RL1.64 g/t Au157m0.83 g/t Au637m0.78 g/t Au528m1100RL900RL700RLSVolcanicsNDrill Hole200 mMineralized IntersectionMeasured <strong>and</strong> Indicated GoldInferred Gold<strong>Snowfield</strong> Zone cross section<strong>Brucejack</strong> ProjectPotential to host ahigh-grade gold-silver depositVisible gold in SU-106TSX:PVG2


GOLD: MARKET OVERVIEWTSX:PVG3


GOLD: MARKET OVERVIEWTSX:PVG4


GOLD: MARKET OVERVIEWTSX:PVG5


GOLD: MARKET OVERVIEWTSX:PVG6


GOLD: MARKET OVERVIEWTSX:PVG7


SILVER: MARKET OVERVIEWTSX:PVG8


SILVER: MARKET OVERVIEWTSX:PVG9


SILVER: MARKET OVERVIEWTSX:PVG10


SILVER: MARKET OVERVIEWTSX:PVG11


WHY PRETIVM: THREE INVESTMENT OPPORTUNITIESStrategic RationaleKey ComparableMine(s)Development<strong>Brucejack</strong>High Grade• Quickest path toproduction• Meaningful high gradeounces present• Economics potentially veryfavorable• Kensington (Coeurd’Alene)• Efemcukuru (Eldorado)• Eleanore (Goldcorp)• PEA underway; likelystraight to feasibility study• Lower capitalrequirements; can befinanced alone• Quicker developmentschedule<strong>Brucejack</strong>Bulk Tonnage• Further upside / goldexposure via drilling• Additional revenues atreasonable cost structure• Malartic (Osisko)• Detour Lake (Detour)• Metates (Chesapeake)• Livengood (Int’l TowerHill)• Mining <strong>and</strong> crushingfacilities built at site• Capital needs can likely bemet via debt financing• Can be developed int<strong>and</strong>em with high-grade<strong>Snowfield</strong>Bulk Tonnage• Long-term gold call option• Rare asset of its sizeworldwide in favorablegeography• Potential to partner withSeabridge• KSM (Seabridge)• Partnering with Seabridgemay enhance economics• Given scale, would likelyrequire support from amajorTSX:PVG


Gold Resources (mm oz)PebbleKSMSF/BJDonlin CreekDetour LakeMetatesLivengoodMalarticHycroftPhoenixLARGE-SCALE NORTH AMERICAN GOLD PROJECTS120.0(NDM)Measured & Indicated ResourcesInferred Resources100.040.480.060.040.020.00.066.9(SEA)14.545.4<strong>Snowfield</strong> <strong>Brucejack</strong>(PVG)12.68.29.025.9(NG/ABX)4.437.9(DGC)5.1(CKG) (ITH) (OSK)2.6 4.00.220.5 17.2 15.7 17.4(WRN)4.58.0(RMX)3.6TSX:PVG13


SNOWFIELD & BRUCEJACK PROJECTSGalore Creek (20km)Avg grade: 27 g/t AuAvg grade: 45 g/t AuAvg grade: 9.6 g/t AuTSX:PVG14


SNOWFIELD & BRUCEJACK PROJECTS<strong>Snowfield</strong>Shore Zone<strong>Brucejack</strong>Galena HillWest ZoneTSX:PVG15


BRUCEJACK GEOLOGYTSX:PVG16


BRUCEJACK PROJECT• Intrusion-related gold/silver vein systems• 60,000 meters of drilling planned for 2011• Resources increased 134% from 2010 to 2011• Mineralization remains open in ALL directionsSurface samplescontaininggold:0.3-0.5 ppm> 0.5 ppm<strong>Brucejack</strong> Bulk-Tonnage Resource Summary – February 2011 (1)(Based on a cut-off of 0.30 grams of gold-equivalent/tonne)Grade Contained MetalTonnes Au Ag Au Ag(mt) (g/t) (g/t) (mm oz) (mm oz)Measured 11.7 2.25 75.56 0.85 28.4Indicated 285.3 0.80 9.57 7.34 87.8Measured & Indicated 297.0 0.86 12.17 8.18 116.2Inferred 542.5 0.72 8.67 12.56 151.21 km(1) Metal price <strong>and</strong> recoveries assumptions are: Au US$1,025/oz. (71%); Ag US$16.60/oz. (70%)TSX:PVG17


BRUCEJACK – HIGH-GRADE• Multi-kilo gold intercepts• 5km existing underground developmentShore Zone• High-grade PEA planned for Q3 2011<strong>Brucejack</strong> 5.0g/t Grade & Tonnage Resource Summary - February 2011 (1)(3)Grade Contained MetalTonnes Au Ag Au Ag(mt) (g/t) (g/t) (mm oz) (mm oz)Measured 1.95 7.95 241.25 0.498 15.10Indicated 1.72 7.33 123.19 0.406 6.82Measured & Indicated 3.67 7.66 185.84 0.903 21.92Inferred 4.71 12.54 49.24 1.898 7.45<strong>Brucejack</strong> 3.0g/t Grade & Tonnage Resource Summary - February 2011 (2)(3)Grade Contained MetalTonnes Au Ag Au Ag(mt) (g/t) (g/t) (mm oz) (mm oz)West ZoneGalena Hill ZoneValley of the KingsMeasured 3.50 5.43 177.98 0.610 19.99Indicated 4.94 4.62 69.33 0.734 11.01Measured & Indicated 8.44 4.96 114.35 1.344 31.01Inferred 9.64 7.80 40.74 2.417 12.62(1)@ 5.0 g/t cut-off within the 0.30 grams of au-equiv/tonne optimized pit shell.(2) @3.0 g/t cut-off within the 0.30 grams of au-equiv/tonne optimized pit shell.(3) Metal price <strong>and</strong> recoveries assumptions are: Au US$1,025/oz. (71%); Ag US$16.60/oz. (70%)TSX:PVG18


BRUCEJACK LONG SECTION900 Drill Holes; 120,000 m of Drilling; 5,000 m Underground DevelopmentNSGalena Hill ZoneShore ZoneWest ZoneOpenOpenExisting 5 kmof undergroundworkingsOpenValley of the KingsHigh-Grade Gold / SilverTSX:PVGGold Grade Legend>0.35 g/t Au200 m200 mViewing window depth: 1,200m19


HIGH-GRADE RESOURCE AREASENValley of KingsS1000mGold Grade LegendLow-Grade Envelope10x10m High-Grade BlockTSX:PVG20


VALLEY OF THE KINGS: CROSS-SECTIONSU-29SU-77SU-5SU-106SU-84SU-40TSX:PVG21


Mitchell Zone(Seabridge Gold)SNOWFIELD PROJECT• Located 65km northwest of Stewart, BCOpen Pit(September 2010 PA)• Gold-enriched porphyry deposit withcopper, silver, molybdenum <strong>and</strong> rheniummineralization• PEA of a joint <strong>Snowfield</strong> / KSM project inplace with SeabridgeMineral Resource Summary – February 2011 (1),(2)GradeContained MetalTonnes Au Ag Cu Mo Re Au Ag Cu(mt) (g/t) (g/t) (%) (ppm) (ppm) (mm oz) (mm oz) (bil lbs)Measured 189.8 0.82 1.69 0.09% 97.4 0.57 4.98 10.3 0.38Indicated 1,180.3 0.55 1.73 0.10% 83.6 0.50 20.93 65.4 2.60Measured & Indicated 1,370.1 0.59 1.72 0.10% 85.5 0.51 25.92 75.8 2.98Inferred 833.2 0.34 1.90 0.06% 69.5 0.43 9.03 50.9 1.10(1) Metal price <strong>and</strong> recoveries assumptions are: Au US$1,025/oz (71%); Ag US$16.60/oz (70%); Cu US$3.0/lb (70%); Mo US$19.00/lb (60%); Re US$145.00/oz. (60%)(2) Mineral resource estimate at 0.30g/t AuEq cut-off.TSX:PVG22


NPV 5% (US$ mm)IRR (%)2010 SNOWFIELD/BRUCEJACK PA• Open pit operation with 27-year mine life• Attractive strip ratios at <strong>Snowfield</strong>(0.57:1) <strong>and</strong> <strong>Brucejack</strong> (2.95:1)• Capital expenditures of US$3,465 million;operating costs of US$9.38/t milled 1• Milling throughput of 120,000 t/dayproducing:• Gold-silver doré• Copper-gold-silver concentrate• Molybdenum-rhenium concentrateAverage Annual ProductionPreliminary Assessment Results <strong>and</strong> Gold Price 2BaseCase 3Spot PriceCase 4NPV @ 5% (US $mm) 2,302 5,951IRR (%) 12.4 21.7Payback (yrs) 5.3 3.5Mine Life (yrs) 27 27Gold Price (US$/oz) 878 1,2352010 Preliminary Assessment Sensitivity Chart 5$4,00019.0%Yrs1 – 8Life ofMine$3,500$3,00017.0%15.0%Gold (000 oz) 960 700$2,50013.0%Silver (000 oz) 7,855 4,162$2,000$1,50011.0%9.0%Copper (000 lb) 39,531 44,582$1,0007.0%Molybdenum (000 lb) 3,514 3,668Rhenium (kg) 9,379 9,011TSX:PVGAu Price (NPV)Au Price (IRR)(1) Capital cost includes US$454.5 million contingency. Operating costs converted from C$ at an exchange rate of 1.00 : 0.92 (C$ : US$).(2) Results are presented on a pre-tax basis as disclosed in the Preliminary Assessment dated October 28, 2010.(3) Metal prices used: US$14.50/oz Ag, US$17.00/lb Mo, US$2.95/lb Cu <strong>and</strong> US$7,811/kg Re.(4) Metal prices used: US$19.03/oz Ag, US$15.88/lb Mo, US$3.26/lb Cu <strong>and</strong> US$5,311/kg Re (as at August 27, 2010).(5) Source: Technical Report <strong>and</strong> Preliminary Assessment of the <strong>Snowfield</strong>-<strong>Brucejack</strong> Project, effective date September 10, 2010.$500(20%) (10%) 0% (Base Case) +10.0% +20.0%Change in Commodity Price (%)Cu Price (NPV)Cu Price (IRR)5.0%23


VALUE CREATION - 2011• Preliminary Assessment on <strong>Brucejack</strong> high-grade gold mineralization• Extensive drill program focused on high-grade resource• Advance <strong>Snowfield</strong>, <strong>Brucejack</strong> or combined project to pre-feasibility<strong>Brucejack</strong> High-Grade PEA<strong>Snowfield</strong> <strong>and</strong>/or <strong>Brucejack</strong> Pre-FeasibilityDrilling at <strong>Brucejack</strong> (High-Grade Focus)Drilling ResultsUpdate <strong>Brucejack</strong> Resource EstimatesUpdate <strong>Brucejack</strong>High-Grade PEA2Q 2011 3Q 2011 4Q 2011 1Q 2012TSX:PVG24


Measured & Indicated + Inferred Gold Grade (g/t)RESOURCE COMPARISON: BRUCEJACK HIGH-GRADE25.020.0Phoenix15.0Red Lake<strong>Brucejack</strong>10.0EfemcukuruKensingtonJerritt CanyonEl PenonEleonore5.0Casa BerardiQuimsacochaMusselwhite0.00.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0Measured & Indicated + Inferred Gold Resources (mm oz)<strong>Brucejack</strong> gold resources based on a cut-off grade of 0.30 grams of gold-equivalent/tonne.Source: Intierra Ltd.TSX:PVG25


WHY PRETIVM?TSX:PVG26


ContactPhone: 604-558-1784Fax: 604-558-4784Toll-free: 1-877-558-1784invest@pretivm.comwww.pretivm.comHead officePretium Resources Inc.570 Granville St.Suite 1600Vancouver, BCCanada V6C 3P1Common SharesTSX:PVGIssued: 85.5 millionFully diluted: 90.5 million52-week hi/low: $14.19/$5.75Market capitalization (at April 12, 2011)$886 million

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!