13.07.2015 Views

צמנט רגיל צמנט : מסמך זה הוא הצעה בלבד מכון התקנים הישראלי

צמנט רגיל צמנט : מסמך זה הוא הצעה בלבד מכון התקנים הישראלי

צמנט רגיל צמנט : מסמך זה הוא הצעה בלבד מכון התקנים הישראלי

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ועדה 10601EN 197-1:2011 (E)h) When the CE marking is given on the bag (this is the normal situation and is preferred) the elements shown onthe Figure ZA.1 shall be given.i) Where the last two digits of the year in which the CE marking is affixed is pre-printed on the bag, the year soprinted should relate to the date of affixing with an accuracy of within plus or minus three months.j) Where the last two digits of the year in which the marking is affixed is to be presented but not pre-printed onthe bag it may be applied by means of date-stamping of the bag in any easily visible position. This positionshould be indicated in the information accompanying the CE marking.In the case of bulk cement, the CE conformity marking, the identification number of the certification body and theaccompanying information as listed before for bagged cement should be affixed in some suitable practical form onthe accompanying commercial documents.In addition to any specific information relating to dangerous substances shown above, the product should beaccompanied, when and where required and in the appropriate form, by documentation listing any legislation ondangerous substances for which compliance is claimed, together with any information required by that legislation.NOTE 1European legislation without national derogations need not be mentioned.NOTE 2 Affixing the CE marking symbol means, if a product is subject to more than one directive, that it complies with allapplicable directives.37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!