13.07.2015 Views

Download (PDF 3.9 MB) - Bosch Thermotechnology

Download (PDF 3.9 MB) - Bosch Thermotechnology

Download (PDF 3.9 MB) - Bosch Thermotechnology

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

16 | Transport4 TransportWARNING: Risk of injury from carrying heavy loads andinadequately securing loads for transport.▶ Use suitable means of transportation, e.g. severalpallet trucks, a forklift truck, crane or heavy dutyrollers.▶ Secure the load against falling.▶ Only use lifting equipment of adequate capacity.▶ Remove the transport straps and the wooden pallet beforepositioning the boiler.▶ For lifting using a rigging crane, use only the lifting provisionssupplied.▶ When lifting the boiler using chains, make sure that at least two chainsare load-bearing. Lift up very carefully.▶ Maintain less than a 45 degree angle with the vertical when lifting theboiler with chains or cables.▶ The rigging crane must be operated by trained personnel.Never pull retaining straps (fixing straps, chains) overthe boiler insulation.Fig. 8Transport6 720 805 218-14.1T6 720 805 218 (2013/02)SB625WS/SB745WS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!