13.07.2015 Views

View File - Development Services - City of Oxnard

View File - Development Services - City of Oxnard

View File - Development Services - City of Oxnard

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE 4-1Phase 1 and Phase 2 GREAT Program Elements Summary TableGREAT Program Element Phase 1 Phase 2Recycled Water – Tertiary Treatment Facility*Tertiary treatment <strong>of</strong> <strong>Oxnard</strong> WWTP waterConstruct 5-mgd-capacity TTFConstruct Secondary Effluent Pipeline – 500 feet <strong>of</strong> 36-inch pipelineExpand TTF to 32.6-mgd CapacityPurpose: Tertiary treatment <strong>of</strong> secondary effluent and potential landscape irrigation.Purpose: Tertiary treatment <strong>of</strong> secondary effluent and potential landscape irrigation.Recycled Water – Advanced Water Treatment Facility* Convert BWRDF to 3.8-mgd-capacity or Construct 3.8-mgd-capacity AWTFExpand AWTF to 15.3-mgd Capacity (with blending – 24-mgd Capacity)Advanced treatment <strong>of</strong> tertiary treated waterOption 1: Upgrade the existing BWRDF – convert and expand BWRDF to advanced water treatmentOption 2: Co-locate new AWTF with TTFConstruct Advanced Treatment Feed Water Pipeline (if Option 1 is implemented) – 500 feet <strong>of</strong> 30-inchpipelinePurpose: Agricultural irrigation, groundwater injection, and industrial users.Purpose: Agricultural irrigation and groundwater injection.Recycled Water Delivery SystemDeliver recycled water to agricultural usersEstablish Recycled Water Delivery System to 3.4-mgd CapacityConvert Existing Ocean <strong>View</strong> Pipeline from Potable to Nonpotable UseConstruct New Ocean <strong>View</strong> Potable Pipeline - 22,300 feet <strong>of</strong> 12-inch pipelineConstruct Tie-in to Former Ocean <strong>View</strong> Pipeline - 2,500 feet <strong>of</strong> 24-inch pipelineExpand Recycled Water Delivery System to 24-mgd CapacityConstruct Phase 2 Recycled Water Delivery System - 25,000 feet <strong>of</strong> 30-inch pipe, parallel to Ocean<strong>View</strong> PipelineConstruct Tie-in to PVCWD Irrigation System –Option 1: Sturgis Road Tie-in – 4,000 feet <strong>of</strong> 24-inch pipelineOption 2: Laguna Road Tie-in – 3,100 feet <strong>of</strong> 24-inch pipelineOption 3: Hueneme Road Tie-in – 2,700 feet <strong>of</strong> 24-inch pipelineAquifer Storage and Recovery (ASR)Groundwater injection, storage, and extractionRegional Desalter*Brackish/groundwater desalination for potable useBlending Station No. 5Blend higher quality surface water with groundwater forpotable useConstruct Tie-in to PTP Irrigation System –Option 1: Channel Islands Blvd. Tie-in – 10,400 feet <strong>of</strong> 16-inch pipelineOption 2: Etting Road Tie-in – 9,200 feet <strong>of</strong> 16-inch pipelineOption 3: Nauman Road Tie-in – 5,400 feet <strong>of</strong> 16-inch pipelinePurpose: Distribute recycled water for irrigation to agricultural users served by the PTP in Pleasant Valleyarea.Implement ASR (620-gpm Total Capacity)Construct Pilot ASR Injection Well – one 620-gpm-capacity well in the Lower Aquifer System (LAS)Construct Pilot ASR Conveyance Pipeline – 2,700 feet <strong>of</strong> 24-inch pipelineBlending Option 1: Use Existing O-H Pipeline – potable water delivery through existing infrastructureBlending Option 2: Construct Turnout from Mugu Lateral – 1,800 feet <strong>of</strong> 10-inch pipelineConstruct New and Retr<strong>of</strong>it Existing Inland ASR Wells for Potable Water ASR – 7 to 8 potable ASRwells at the <strong>City</strong> Water Yard (251 Hayes Avenue)Purpose: Pilot ASR will assess the technical feasibility <strong>of</strong> using potable and recycled water for ASR,intended to help alleviate groundwater overdraft conditions and associated water qualityproblems, including coastal seawater intrusion in the <strong>Oxnard</strong> Plain and Pleasant Valley area.Inland Potable ASR will allow seasonal storage <strong>of</strong> potable water supplies to maximize use <strong>of</strong>the existing potable water distribution system, negating the need for construction <strong>of</strong> additionalpipelines for additional distribution capacity.Construct 5-mgd Regional DesalterPurpose: Treat pumped groundwater obtained through unused <strong>City</strong> groundwater pumping allocation andgroundwater storage credits for potable water production.Construct 15-mgd Blending Station No. 5Construct Connection to O-H Pipeline – 100 feet <strong>of</strong> 18-inch pipelineConstruct Connection to Industrial Lateral – 100 feet <strong>of</strong> 18-inch pipelineConstruct Blended Water Pipeline Connection – 2,200 feet <strong>of</strong> 20-inch pipelinePurpose: Provide improved water supply infrastructure reliability, water quality, and hydraulic efficienciesand to assist in meeting peak-hour and fire-flow water supply demands.N/APurpose: Expand recycled water distribution area to agricultural users served by PVCWD in the PleasantValley area.Expand Recycled Water ASR to 11.5-mgd CapacityConstruct Coastal Recycled Water ASR/Seawater Intrusion Barrier –Construct Coastal ASR Conveyance PipelineConstruct Coastal ASR Well LateralsInland Recycled Water ASR – use various new or existing inland ASR wellsPurpose:Control seawater intrusion in the <strong>Oxnard</strong> Plain and Pleasant Valley area.Assist with overall water balance <strong>of</strong> the <strong>Oxnard</strong> Plain and Pleasant Valley area.Expand Regional Desalter to 10 mgdPurpose: Expand capacity <strong>of</strong> Regional Desalter for treatment <strong>of</strong> pumped groundwater for production <strong>of</strong>additional potable water supplies.N/AConcentrate Collection SystemConstruct Concentrate Collection System - 57,000 feet <strong>of</strong> gravity pipeline (6- to 54-inch)Brine collection from regional brine dischargersPurpose: Avoid discharge <strong>of</strong> high salinity concentrate into <strong>City</strong> sanitary sewer system and <strong>Oxnard</strong> WWTP.Permeate Delivery SystemN/AConstruct Permeate Delivery System - 21,100 feet <strong>of</strong> pressure pipeline (6- to 12-inch)Permeate delivery from Regional Desalter to industrialPurpose: Convey permeate from Regional Desalter. This will negate the need for individual industrialusersfacilities to operate their individual advanced water treatment systems for treatment <strong>of</strong> <strong>City</strong> watersupply.Concentrate Disposal Discharge concentrate to ocean outfall Discharge concentrate to ocean outfallNote: * Generates concentrate requiring disposalW112003002SCO /DRD743.DOC/ 033500011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!