Gasifier Experimenters Kit - Pole Shift Survival Information
Gasifier Experimenters Kit - Pole Shift Survival Information Gasifier Experimenters Kit - Pole Shift Survival Information
Untitled DocumentA containerized building and transport strategy will create a desert set up involving next to zeroon site immaculate building. All components will arrive "pre-assembled" and only need to beset in place for a forklift and snap plumbed together. The superstructure will require more "bypiece" assembly of the hoops and cloth, but all these pieces just slide into fixture "poles holes"and the cloth is stretched like a shade awning.Likewise, this modular building strategy will make take down and clean up more of an effort of"truck loading" than object disassembly and loose part chasing.To expediate set up, maintenance and take down, we propose trucking the Shipyard forklift tothe desert for the combined use of the Mechabolic, Neverwas Haul and Serpent Motherprojects. The current DPW formal scheduling and "DPW only operators" make quickadjustments and fixes of unexpected problems very difficult to handle in an efficient manner. Itis difficult to schedule problems and fixes, and when clear long engagements are needed, DPWequipment is often stretched between several differnent projects and needs to break in themiddle of long projects to go tend to other needs. We therefore think it would be a goodinvestment to have our own forklift for discretionary use, 24/7. I will offer my 15,000lbcapacity forklift free of charge for use by these three projects, but request money to haul it thereand back.As for direct clean up, I believe the most important strategy is to have clear up front agreementson responsibilities, as well as publically stated "can't leave before x date" mutualunderstandings. Each sub project leader in the Mechabolic will have to agree to remain in thedesert until the entire project is back in the contianers, the site picked clean and magnetbroomed, with a final walk line survey. No individual decisions that clean up is "done", and it isok to leave now because the person is tired. All the project leaders have to stay until we can allsign off on the clean up effort together.Trash at the end should be a non-issue, as the Mechabolic eats trash for its food/fuel. The onlyreal expected "discard" is the charash byproduct of gasification, which we will use for terrapreta fertilizer in the lung terrariums. After the event, we want to leave this fertilizer for a localagricultural use, where the charash carbon will be sequestered by the plow and transformed intofuel for the next crop, not released as methane, nitrous oxide and CO2 during rotting, as wouldhave otherwise happened had the original trash just gone to the dump.Completing the biomass cycle in this manner, the Mechabolic project will operate with aquantifyable green house gas NEGATIVE footprint. The total Mechabolic effort will removemore CO2 and other greenhouse gases from the atmosphere than it will emit through poweringitself and its fire efforts. Such is the real and interesting "clean up" that the Mechabolic projectwill bring to the desert this year.http://whatiamupto.com/mechabolic/cleanup.html (2 of 3) [10/9/2008 08:18:12]
Untitled DocumentThe thoughful burning of things through gasification, is very different than the regular burningof things through open combustion.http://whatiamupto.com/mechabolic/cleanup.html (3 of 3) [10/9/2008 08:18:12]
- Page 352 and 353: http://whatiamupto.com/gasification
- Page 354 and 355: http://whatiamupto.com/gasification
- Page 356 and 357: http://whatiamupto.com/gasification
- Page 358 and 359: http://whatiamupto.com/gasification
- Page 360 and 361: http://whatiamupto.com/gasification
- Page 362 and 363: Flickr: wuonm's PhotostreamFlickr B
- Page 364 and 365: Flickr: Filmo's stuff tagged with g
- Page 366 and 367: truck_1 - Page 1This is a low densi
- Page 368 and 369: The Gengas Pageand F. P. Zimmerman,
- Page 370 and 371: WorkshopsFour CoreProcessesHow a Ma
- Page 372 and 373: Workshopshttp://whatiamupto.com/gas
- Page 374 and 375: Untitled DocumentHomeProject Descri
- Page 376 and 377: OverviewThe Mechabolic: OverviewHom
- Page 378 and 379: Overviewhydrocarbons and various fo
- Page 380 and 381: Untitled DocumentI started reading
- Page 382 and 383: Untitled DocumentHomeProject Descri
- Page 384 and 385: Untitled Documentsomewhat flexible
- Page 386 and 387: Untitled Documenthttp://whatiamupto
- Page 388 and 389: Untitled DocumentHomeProject Descri
- Page 390 and 391: Untitled DocumentV2.0 First mobile
- Page 392 and 393: Untitled DocumentHomeProject Descri
- Page 394 and 395: Untitled DocumentHomeProject Descri
- Page 396 and 397: Untitled DocumentHomeProject Descri
- Page 398 and 399: Untitled DocumentHomeProject Descri
- Page 400 and 401: Untitled DocumentAugust: Deal with
- Page 404 and 405: Untitled DocumentHomeProject Descri
- Page 406 and 407: Fast, easy, secure payments for eBa
- Page 408 and 409: http://whatiamupto.com/mechabolic/j
- Page 410 and 411: http://whatiamupto.com/mechabolic/d
- Page 412 and 413: http://www.woodgas.com/Become aMemb
- Page 414 and 415: http://www.woodgas.com/OPEC oil emb
- Page 416 and 417: http://www.woodgas.com/to a common
- Page 418 and 419: http://www.woodgas.com/energy conte
- Page 420 and 421: http://whatiamupto.com/mechabolic/s
- Page 422 and 423: gek - Page 2© Jim Masonhttp://thes
- Page 424 and 425: gek - IMG_0512Gasifier Experimenter
- Page 426 and 427: gek - IMG_0503Gasifier Experimenter
- Page 428 and 429: gek - IMG_0514Gasifier Experimenter
- Page 430 and 431: gek - IMG_0504Gasifier Experimenter
- Page 432 and 433: gek - IMG_0507Gasifier Experimenter
- Page 434 and 435: gek - IMG_0519Gasifier Experimenter
- Page 436 and 437: gek - IMG_0566Gasifier Experimenter
- Page 438 and 439: gek - IMG_0565Gasifier Experimenter
- Page 440 and 441: gekparts - IMG_0981●Gasifier Expe
- Page 442 and 443: gekparts - IMG_0995●Caption:AllVe
- Page 444 and 445: gekparts - IMG_1009© ALL Power Lab
- Page 446 and 447: gekparts - IMG_1018© ALL Power Lab
- Page 448 and 449: gekparts - IMG_1011© ALL Power Lab
- Page 450 and 451: gekparts - IMG_1015© ALL Power Lab
Untitled DocumentA containerized building and transport strategy will create a desert set up involving next to zeroon site immaculate building. All components will arrive "pre-assembled" and only need to beset in place for a forklift and snap plumbed together. The superstructure will require more "bypiece" assembly of the hoops and cloth, but all these pieces just slide into fixture "poles holes"and the cloth is stretched like a shade awning.Likewise, this modular building strategy will make take down and clean up more of an effort of"truck loading" than object disassembly and loose part chasing.To expediate set up, maintenance and take down, we propose trucking the Shipyard forklift tothe desert for the combined use of the Mechabolic, Neverwas Haul and Serpent Motherprojects. The current DPW formal scheduling and "DPW only operators" make quickadjustments and fixes of unexpected problems very difficult to handle in an efficient manner. Itis difficult to schedule problems and fixes, and when clear long engagements are needed, DPWequipment is often stretched between several differnent projects and needs to break in themiddle of long projects to go tend to other needs. We therefore think it would be a goodinvestment to have our own forklift for discretionary use, 24/7. I will offer my 15,000lbcapacity forklift free of charge for use by these three projects, but request money to haul it thereand back.As for direct clean up, I believe the most important strategy is to have clear up front agreementson responsibilities, as well as publically stated "can't leave before x date" mutualunderstandings. Each sub project leader in the Mechabolic will have to agree to remain in thedesert until the entire project is back in the contianers, the site picked clean and magnetbroomed, with a final walk line survey. No individual decisions that clean up is "done", and it isok to leave now because the person is tired. All the project leaders have to stay until we can allsign off on the clean up effort together.Trash at the end should be a non-issue, as the Mechabolic eats trash for its food/fuel. The onlyreal expected "discard" is the charash byproduct of gasification, which we will use for terrapreta fertilizer in the lung terrariums. After the event, we want to leave this fertilizer for a localagricultural use, where the charash carbon will be sequestered by the plow and transformed intofuel for the next crop, not released as methane, nitrous oxide and CO2 during rotting, as wouldhave otherwise happened had the original trash just gone to the dump.Completing the biomass cycle in this manner, the Mechabolic project will operate with aquantifyable green house gas NEGATIVE footprint. The total Mechabolic effort will removemore CO2 and other greenhouse gases from the atmosphere than it will emit through poweringitself and its fire efforts. Such is the real and interesting "clean up" that the Mechabolic projectwill bring to the desert this year.http://whatiamupto.com/mechabolic/cleanup.html (2 of 3) [10/9/2008 08:18:12]