Bracing InformationBrace Length and Safe Working Loads (Cont.)B-6 Short Pipe BraceD WF B12'-0"8'-0"6'-0"10'-0"13'-0"8'-9"6'-6"10'-9"14'-0"9'-5"7'-0"11'-8"15'-0"10'-0"7'-6"12'-5"16'-0"10'-9"8'-0"13'-3"Safe Working LoadWithout Knee Bracing6,500 lbs.6,450 lbs.5,225 lbs.4,450 lbs.3,750 lbs.Note: Depending on panel thickness and height, a double mat of reinforcing steel may be required to resist the bending stresses oftemporary wind loads.SWL provides a minimum factor of safety of 1.5 to 1.Bracing InformationJumbo Pipe BracesType D W F B Safe Working Load WithoutKnee, Lateral andEnd BracingB-7 15’-0” to 24’-0” 13’-6” 10’-3” 17’-0” 6,500 lbs.B-8 19’-0” to 31’-0” 17’-6” 13’-3” 22’-0” 6,500 lbs.B-9 23’-0” to 39’-0” 21’-6” 16’-3” 27’-0” 4,800 lbs.B-10 27’-0” to 46’-0” 25’-6” 19’-3” 32’-0” 3,600 lbs.B-11 22’-0” 20’-5” 15’-4” 25’-6” Min. 9,000 lbs.B-11 58’-0” 32’-0” 24’-0” 40’-0” Max. 9,000 lbs.B-12 27’-0” to 46’-0” 25’-6” 19’-3” 32’-0” 9,000 lbs.B-14 35’-0” to 60’-0” 33’-6” 25’-3” 42’-0” 5,200 lbs.B-15 43’-0” to 60’-0” 41’-6” 31’-3” 52’-0” 3,800 lbs.B-16 42’-0” 28’-9” 21’-8” 37’-0” 8,000 lbs.B-17 35’-0” to 60’-0” 33’-6” 25’-3” 42’-0” 12,000 lbs.B-18 43’-0” to 60 -0” 41’-6” 31’-3” 52’-0” 12,000 lbs.Note: Depending on panel thickness and height, a double mat of reinforcing steel may be required to resist the bending stresses oftemporary wind loads.SWL provides a minimum factor of safety of 1.5 to 1.Note! When calculating maximum brace spacing always compare the selected brace safe working load with the maximum brace load thatcan be safely carried by the brace anchor.86 04-09
Sandwich PanelConnectorsP-24 Delta TieThe Dayton Superior P-24 Delta Tie is a unique insulated tilt-up concrete panel connector. It allows the contractor tofabricate a highly energy-efficient, insulated concrete sandwich wall panel using the insulating foam of his choice.This versatile connector allows the foam insulation to be placed from panel edge to panel edge, eliminating thermalbridges and costly energy loss. The foam insulation is sandwiched between two concrete wythes, or layers, to form a longlasting,energy-efficient concrete sandwich wall panel. The three wythes are tied together using P-24 Delta Ties. Spacing ofthe Delta Ties varies, based on the panel’s required composite moment capacity.The Delta Tie is produced using an engineered composite matrix. It consists ofa geometrically configured, two-dimensional truss manufactured from continuouswound fiberglass embedded in an alkali resistant resin. The design of the Delta Tieproduces a connector of remarkable strength and durability.The non-metallic, non-corrosive design of the Delta Tie eliminates any thermaltransfer through the panel, increasing the insulating efficiency of the panel.Advantages• Increased load bearing.• Stiffer insulated panels, easier to handle.• Design flexibility.• Material, labor and transportation cost reduction.• Quick and easy installation.• Applicable to all brands of foam panel insulation.P-24 Delta TieThe standard Delta Tie dimensions are shown in the accompanying detail.The connector is designed so that it can be oriented in the panel either on endor side, depending on the thickness of the insulation. For example, the 5” x 7” sizecan be used on its side in a 1” to 2” insulation or on end for 2” to 4” insulation. TheDelta Tie can be used with any rigid insulation from 1” to 4” thick. This versatile,dual-use feature adds to the Delta Tie’s effective application compatibility and, atthe same time, reduces inventory and storage requirements.In individual connector specimen and full size panel tests the Delta Tie hasexhibited excellent loading behavior and load capacities.Increased Load BearingTests have verified the excellent tension and shear strength characteristics of theDelta Tie insulated panel connector.The P-24 Delta Tie has the following ultimate capacities:• 3,220 lbs. in shear.• 3,100 lbs. in tension.Stiffer Insulated Concrete PanelsPatent PendingP-24 Delta TieThe inherent capabilities of the truss design greatly increase the stiffness of the panel. The added stiffness makes the paneleasier to lift, handle, store and/or transport.Design FlexibilityDue to the composite action gained by using the Delta Tie, panels may be cast in longer lengths or with thinner concretewythes. Contact Dayton Superior for design programs available for Engineers.Cost SavingsThe Delta Tie design provides a fast and easy installation to save labor. It produces stiffer panels to lessen handling. Theconnector’s design flexibility allows the cost saving attributes to be designed into the panel. Delta Tie connectors are purchasedas a separate item, allowing the contractor to provide the foam insulation of his choice.Quick and Easy InstallationThe two-dimensional design of the Delta Tie lends itself to easy installation. No drilling or special tools required. Simply usethe foam as a straight-edge template to quickly place the connectors.5"3"1/2" Typ.5"7"Sandwich PanelSystemMaximum recommended spacing is 8 square feet of panel per panel connector.For spacing other then 8 square feet of panel per connector, contact a Dayton Superior Technical Service Center.To Order:Specify: (1) quantity, (2) name.Example:500, P-24 Delta Ties.02-0987
- Page 37 and 38: Ground Release IISystemHow to use t
- Page 39 and 40: Ground Release IISystemT-42 Double
- Page 41 and 42: Ground Release IISystemHow to use t
- Page 43 and 44: Ground Release IISystemP-52 Swift L
- Page 45 and 46: Ground Release IISystemHow To Insta
- Page 47 and 48: Ground Release IISystemP-60 Swift L
- Page 49 and 50: Gyro Tilt PlusSystemGyro Tilt Plus
- Page 51 and 52: Gyro Tilt PlusSystemT-50 Gyro Tilt
- Page 53 and 54: Gyro Tilt PlusSystemHow to Remove t
- Page 55 and 56: Tilt-Up 3Lifting SystemTILT-UP 3 LI
- Page 57 and 58: Tilt-Up 3Lifting SystemHow to Remov
- Page 59 and 60: Tilt-Up 3Lifting SystemMinimum Inse
- Page 61 and 62: Coil InsertsT-2 Double Pick-up Inse
- Page 63 and 64: Coil InsertsHow to use Coil Face In
- Page 65 and 66: Coil InsertsTotal System and Safe W
- Page 67 and 68: Coil InsertsT-8 Lifting Angle• De
- Page 69 and 70: Strongback SystemStrongbacksWhen op
- Page 71 and 72: Strongback SystemT-13-D Strongback
- Page 73 and 74: Strongback SystemT-63 Aluminum Stro
- Page 75 and 76: Bracing InformationBrace LoadingBra
- Page 77 and 78: Bracing InformationBrace to Floor S
- Page 79 and 80: Bracing InformationKnee, Lateral an
- Page 81 and 82: Bracing InformationBracing to Cylin
- Page 83 and 84: Bracing InformationT-13 COIL-ANCHOR
- Page 85 and 86: Bracing InformationT-4 Brace Anchor
- Page 87: Bracing InformationBrace Length and
- Page 91 and 92: Sandwich PanelConnectorsDelta Tie I
- Page 93 and 94: Form LinersWhen it is time to choos
- Page 95 and 96: Form LinersWood Patterns4" Wide Age
- Page 97 and 98: Form LinersBlock PatternsBrick Patt
- Page 99 and 100: Form LinersStone PatternsRugged Fla
- Page 101 and 102: Form LinersVinyltite1.500" 1.500"0.
- Page 103 and 104: Form LinersApplication GuideTilt-Up
- Page 105 and 106: MiscellaneousT-58 Double Chamfer St
- Page 107 and 108: MiscellaneousRustications, Chamfers
- Page 109 and 110: MiscellaneousP-80 Shim StripsDayton
- Page 111 and 112: MiscellaneousMetal Supports for Reb
- Page 113 and 114: Cure Miscellaneous andBondbreakerBo
- Page 115 and 116: MiscellaneousCure andBondbreakerSur
- Page 117 and 118: Chemical Miscellaneous & Cement Pro
- Page 119 and 120: MiscellaneousPanel ChecklistFor saf
- Page 121 and 122: MiscellaneousMiscellaneous andChemi
Bracing InformationBrace Length and Safe Working Loads (Cont.)B-6 Short Pipe BraceD WF B12'-0"8'-0"6'-0"10'-0"13'-0"8'-9"6'-6"10'-9"14'-0"9'-5"7'-0"11'-8"15'-0"10'-0"7'-6"12'-5"16'-0"10'-9"8'-0"13'-3"Safe Working LoadWithout Knee Bracing6,500 lbs.6,450 lbs.5,225 lbs.4,450 lbs.3,750 lbs.Note: Depending on panel thickness and height, a double mat of reinforcing steel may be required to resist the bending stresses oftemporary wind loads.SWL provides a minimum factor of safety of 1.5 to 1.Bracing InformationJumbo Pipe BracesType D W F B Safe Working Load WithoutKnee, Lateral andEnd BracingB-7 15’-0” to 24’-0” 13’-6” 10’-3” 17’-0” 6,500 lbs.B-8 19’-0” to 31’-0” 17’-6” 13’-3” 22’-0” 6,500 lbs.B-9 23’-0” to 39’-0” 21’-6” 16’-3” 27’-0” 4,800 lbs.B-10 27’-0” to 46’-0” 25’-6” 19’-3” 32’-0” 3,600 lbs.B-11 22’-0” 20’-5” 15’-4” 25’-6” Min. 9,000 lbs.B-11 58’-0” 32’-0” 24’-0” 40’-0” Max. 9,000 lbs.B-12 27’-0” to 46’-0” 25’-6” 19’-3” 32’-0” 9,000 lbs.B-14 35’-0” to 60’-0” 33’-6” 25’-3” 42’-0” 5,200 lbs.B-15 43’-0” to 60’-0” 41’-6” 31’-3” 52’-0” 3,800 lbs.B-16 42’-0” 28’-9” 21’-8” 37’-0” 8,000 lbs.B-17 35’-0” to 60’-0” 33’-6” 25’-3” 42’-0” 12,000 lbs.B-18 43’-0” to 60 -0” 41’-6” 31’-3” 52’-0” 12,000 lbs.Note: Depending on panel thickness and height, a double mat of reinforcing steel may be required to resist the bending stresses oftemporary wind loads.SWL provides a minimum factor of safety of 1.5 to 1.Note! When calculating maximum brace spacing always compare the selected brace safe working load with the maximum brace load thatcan be safely carried by the brace anchor.86 04-09