13.07.2015 Views

TILT-UP CONSTRUCTION - Brock White

TILT-UP CONSTRUCTION - Brock White

TILT-UP CONSTRUCTION - Brock White

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Tilt-Up 3Lifting SystemTilt-Up 3 Hardware Installation SequenceTop ofPanelTop ofPanelTop ofPanelLifting SystemsCoil Inserts1) Tilt-Up 3 Hardware in open positioncentered over the T-90-F Insert.2) The Hardware nestled in the InsertRecess and the Bolt/Release Armengaged. The Bolt/Release Armmust contact the panel surface asshown in the sketch. Chip awayexcess concrete, if necessary, tonest the Bolt/Release Arm on theconcrete surface. Contact a DaytonSuperior Technical Service Center ifunable to nest the Bolt/Release Armon the face of the panel.3) The installation is complete. Erectionmay proceed.T-92 Tilt-Up 3 Lifting Hardware Release Sequence1) After the panel erection is complete and the panelhas been properly braced/tied-off, the crane lineshould be relaxed slightly to permit the release ofthe lifting hardware.2) To Release the hardware, apply a quick, evendownward force to the release line. The hardwarestays attached to the crane line and is moved tothe next panel.56 04-09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!