13.07.2015 Views

TILT-UP CONSTRUCTION - Brock White

TILT-UP CONSTRUCTION - Brock White

TILT-UP CONSTRUCTION - Brock White

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ground Release IISystemHow To Install the Swift Lift AnchorAnchor FootAnchor HeadP-52 SwiftLift AnchorLifting SystemsCoil InsertsAssemble the P-54 Recess Plug by placing the head1. of the P-52 Swift-Lift Anchor inside any two halves ofthe recess plug. Then snap the two halves together. Itis very difficult to assemble the unit with the foot of theanchor inside the P-54 Recess Plug and still get thetwo halves to close together correctly. If the two halvesof the P-54 Recess Plug do not fit closely together, itcould be because the anchor is in upside down. In sucha case, reverse the anchor and try again.A correctly assembled P-54 Recess Plug and anchor.2.Attach the assembled P-54 Recess Plug and anchor to3. the formwork in its predetermined location withthe recess plug seam in the vertical position. Usecommon (not double headed) nails in the upperthree tabs of the recess plug. The plug and anchorassembly can also be attached to the formwork byusing a 2 ton stud and wingnut if desired. Providebar supports around the anchor as shown to preventdisplacement during the casting process.Slip the preformed shear bar onto the P-54 Recess4. Plug as shown. The receiving tabs of the P-54 RecessPlug will correctly position the shear bar. Usually, additionalsupport wiring is not needed to hold the shearbar in place. However, prudent users will provide anadditional wire tie or two to make certain the shearbar will not dislodge during concrete placement. Wiretie the P-52 Swift-Lift Anchor to reinforcing steel asshown.04-0943

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!