13.07.2015 Views

TILT-UP CONSTRUCTION - Brock White

TILT-UP CONSTRUCTION - Brock White

TILT-UP CONSTRUCTION - Brock White

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ground Release IISystemHow to use the Ground Release II System - T-43-L HardwareDo Not Use This System On Top Surface, Seeded, Exposed Aggregate 3/4” or Larger.Precheck all insert holes with hardware prior to erection date, following instruction steps 2, 3 and 4,so that during tilting, proper hardware action is assured. See page 36 for proper procedure for removalof plastic recess plug.Install the insert so the directional arrow on the plastic recess plug1. points to the top or bottom of the panel. Wire tie the insert intoposition using a short length of additional reinforcing steel (rebar)placed tight against each side of the insert. Next, near each endof the plastic void former, secure a tie wire to one of the additionalrebars, running the wire over the top of the plastic void former andback down, securing it to the additional rebar on the other side ofthe insert. Be sure to run the tie wire between the metal ring and theplastic void former as shown in the sketch to the right.Note: The short length of rebar recommended is an aid to prevent theinsert from moving during concrete placement. When this rebar is addedfor insert stability, it should be placed against the vertical portion of theinsert and at least 1”away from the insert’s foot. This extra rebar is notrequired to develop the insert’s safe working load.Lifting SystemsCoil InsertsRelease ArmMain BodyRelease LineBailThe various parts of the T-43-L2. Ground Release II Lifting Hardwareare shown above.To install the lifting hardware onto3. the insert, hold the hardware bythe bail, release arm, and lower itonto the head of the insert. Checkto make certainthat the release arm points to thetop of the panel.Lower the release arm parallel to the4. face of the panel. Lay the releaseline along side of the lifting hardwareso that the line goes to the bottomof the panel. With the crane linesattached, the panel is now ready forlifting.As the panel is lifted, friction from5. the load on the insert prevents thelifting hardware from prematurelyreleasing. Brace and secure thepanel into position.The crane line should be6. slackened slightly to permitthe release of the lifting hardware.To release the lifting hardware,apply a single downward force tothe release line.The lifting hardware remains in7. the open position, ready to belowered to the ground and attachedto the next panel.Danger! The crane line and bail of the lifting hardware must be turned in the direction of the cable forces before the lifting operationbegins. The crane line must not be allowed to apply a sideward force on the bail, as this condition is dangerous and could lead topremature failure of the hardware or insert.04-0935

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!