Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SuperiorLifting SystemT-110 Superior Lift Hardware Installation SequenceTop ofPanelTop ofPanelTop ofPanelLifting SystemsCoil Inserts1) T-120 Hardware in open positioncentered over the T-110 Insert.2) The Hardware nestled in the InsertRecess and the Bolt/Release Armengaged. The Bolt/Release Armmust contact the panel surface asshown in the sketch. Chip awayexcess concrete, if necessary, tonest the Bolt/Release Arm on theconcrete surface. Contact a DaytonSuperior Technical Service Center ifunable to nest the Bolt/Release Armon the face of the panel.3) The installation is complete. Erectionmay proceed.T-120 Superior Lift Lifting Hardware Release Sequence1) After the panel erection is complete and the panelhas been properly braced/tied-off, the crane lineshould be relaxed slightly to permit the release ofthe lifting hardware.2) To Release the hardware, apply a quick, evendownward force to the release line. The hardwarestays attached to the crane line and is moved tothe next panel.04-0931