13.07.2015 Views

TILT-UP CONSTRUCTION - Brock White

TILT-UP CONSTRUCTION - Brock White

TILT-UP CONSTRUCTION - Brock White

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MiscellaneousPanel ChecklistFor safety the contractor must perform the following checksto verify dimensions and conditions before casting or erectingpanels. he must also consult with the crane contractor tomake certain that the crane and rigging is sized properly andthat a safe and efficient panel erection sequence is plannedand followed.Panel Number or TypeCheck:Panel Width & HeightPanel Opening & LocationPanel Thickness — Structural & OverallPanel Cast Correct Face UpSufficient Bond Breaker AppliedReinforcing Size & LocationLift Insert Type & SizeLift Insert LocationBrace Anchor Type & SizeBrace Anchor LocationStrongback Insert Type & SizeStrongback Insert LocationInserts Correctly Tied in PlaceExposed Aggregate Size (If Used)Specified Compressive StrengthSufficient Bolt PenetrationProper Lifting HardwareCable Lengths & Rigging ConfigurationStrongback Size & LocationProper Brace TypeImproper use of Concrete Accessories Can CauseSevere Injury or DeathRead, understand and follow the information and instructions in this publicationbefore using any Dayton Superior concrete accessories displayed herein.Whenin doubt about the proper use or installation of any Dayton Superior concreteaccessory, immediately contact the nearest Dayton Superior office or technicaldepartment for clarification. See the inside back cover for nearest location.Miscellaneous andChemical Products02-09117

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!