Tabernilla ReachDepth equal or over 16.76m MLLDepth less than 16.76m MLLCondition as of April 15, 2008Reach was completed in September 2009OPD’s work plan for 2010Gatun Lake• Complete San PabloReach. 940,000 m 3 outof 4,477,420 m 3Depth equal or over 16.76m MLLDepth less than 16.76m MLLCondition as of April 15, 2008• Dredge in Mamei Reach112,000 m 3 out of2,768,155 m 3 Condition as of January 05, 2010