13.07.2015 Views

PROFOS - Pipelife International

PROFOS - Pipelife International

PROFOS - Pipelife International

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Drawing 1 <strong>PROFOS</strong> laying in traffic zones7.3. <strong>PROFOS</strong> assembly requirements● An assembly plan (see sample assembly plan on Drawing1,2 and 3), prepared in accordance with specific design and terrain. . data and conditions.● A trench and levelled bedding according to the assembly plan.● To be checked the draw tank – manhole for cracks and defects on the body if any appear during transportation and storage.. . To be checked the leak-tightness of the inlet and outlet connections.● To lay and level <strong>PROFOS</strong> by a lifting device or by ropes. When dropping in the trench use the designated spots.● When covering and sealing the different levels, the instructions described in the assembly plan must be followed.● Before coving and sealing <strong>PROFOS</strong> must be connected to the corresponding sewerage. There must be manual sealing. . around the connections.● There must be manual sealing in the zone around the cover and additional reinforcing with bricks or concrete belt on which. . must laid the ring and the manhole’s coverIf on the spot are made additional openings in the draw tank, they must be made so that they guarantee leak-tightness.26<strong>Pipelife</strong>www.pipelife.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!