13.07.2015 Views

PROFOS - Pipelife International

PROFOS - Pipelife International

PROFOS - Pipelife International

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Note (see Table7):1) Tank’s type:● Existing sewage network – diameter and pipeline bottom elevation of discharge● Existing manhole – manholes diameter and manhole bottom elevation in relation to the terrain● Treatment station – elevation of connection according to the designer’s plan2) Angle of connection - measured clockwise where the outlet (discharge pipe) is accepted as 0º!3) Elevation in relation to the terrain - the difference between the elevation level and the bottom of the carrying seage pipeDDN coverKTBP inletLBP outletBP1H gwН geodeticDNQELGWDiagram 3 Designation of data necessary for project documentation preparation7. <strong>PROFOS</strong> assembly7.1. Introduction and general requirementsThe facilities assembly must be in accordance with the design and terrain conditions. Their proper execution guarantees long andproblem free exploitation life.7.2. <strong>PROFOS</strong> laying advantages● Fast and easy assembly● Final product ready for laying● Variant of reinforcement against high underground waters● Easy connection with the existing sewerage● An opportunity for inspection chambers extension to the necessary elevation terrain● No need of special mechanization for laying● No need of shuttering<strong>Pipelife</strong>www.pipelife.com25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!