13.07.2015 Views

PROFOS - Pipelife International

PROFOS - Pipelife International

PROFOS - Pipelife International

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NTankNominalvolumeL (м) D (м) H (м) h1 (м) h2 (м)Work volume(м 3 )Weight(kg)12ECO-T3000 3000 л 2,16 1,43 1,53 1,38 1,31 2,39 120ECO-T5000 5000 л 2,83 1,72 1,81 1,66 1,61 4,69 190ECO-TR8000 8 000 л 2,68 2,31 2,43 2,31 2,24 8,27 320ECO-TR12000 12 000 л 3,76 2,31 2,43 2,31 2,24 12,04 350ECO-TR20000 20 000 л 6,28 2,31 2,43 2,31 2,24 20,82 650ECO-TR30000 30 000 л 8,80 2,31 2,43 2,31 2,24 29,60 930ECO-TR40000 40 000 л 11,32 2,31 2,43 2,31 2,24 38,36 1200ECO-TR50000 50 000 л 13,84 2,31 2,43 2,31 2,24 47,12 1460Табле 6 <strong>Pipelife</strong> Tanks type● Valves manholesWhen it is not possible laying of valves in the sewerage pump station, a different manhole is is planned for distribution, reduction andlaying of the necessary valves. It is made is PRO type manholes with an opportunity for revision with a ladder and a cover for the correspondingload. It is situated after the pump station and its laying is not different from <strong>Pipelife</strong> PRO type inspection chambers (seeCatalogue DN 630, 800, 1000 Inspection chambers and Diagram 1).<strong>Pipelife</strong>www.pipelife.com19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!