<strong>East</strong> <strong>London</strong>/<strong>Greenwich</strong> <strong>Waterfront</strong> <strong>Transit</strong> <strong>Projects</strong><strong>London</strong> <strong>City</strong> Airport Transport Forum28 September 2004By Gbenga Dairo, Project Manager Light <strong>Transit</strong>


ELT/GWTTechnologyLight Transport in <strong>London</strong>


<strong>East</strong> <strong>London</strong> <strong>Transit</strong>Light Transport in <strong>London</strong>


Light Transport in <strong>London</strong>


Light Transport in <strong>London</strong>


<strong>East</strong> <strong>London</strong> <strong>Transit</strong>Light Transport in <strong>London</strong>


<strong>East</strong> <strong>London</strong> <strong>Transit</strong>TimetableELT Phase 1• 2nd July 2004 - PRG• 27th July 2004 - LB Redbridge• 17th Aug 2004 - LB Barking and Dagenham• 2005 - Detailed design and public consultation• 2006 - Tender and construction• 2006/07 - <strong>Transit</strong> service procurement and operationFuture Phases• ELT Phase 2 - Development work between November 2004 and Summer 2005• Future phases to be programmed during 05/06Light Transport in <strong>London</strong>


<strong>Greenwich</strong> <strong>Waterfront</strong> <strong>Transit</strong>Light Transport in <strong>London</strong>


<strong>Greenwich</strong> <strong>Waterfront</strong> <strong>Transit</strong>Project Status• Phase 1 Infrastructure - Abbey Wood to Woolwich Ferry Roundabout(7km)• Phase 1 Operations - Abbey Wood through to North <strong>Greenwich</strong> (12km) -Using Ph 1 infrastructure, bus priority measures and 1.7 km of existing,dedicated infrastructure on <strong>Greenwich</strong> Peninsula• Operations to be based on articulated buses with enhanced transit stopsetc• Engineering feasibility work on Phase 1 and 2a in progress• Process of safeguarding Phase 1 infrastructure in progress, jointly with<strong>London</strong> Boroughs of <strong>Greenwich</strong> and Bexeley• Phase 3 infrastructure planning to commence next financial yearLight Transport in <strong>London</strong>


<strong>Greenwich</strong> <strong>Waterfront</strong> <strong>Transit</strong>TimetableGWT Phase 1• Apr/Sept 2004 - Feasibility and Development• Oct/Dec 2004 - Follow up public consultations• Oct 2004 - Business Case update• Apr 2005 - Safeguard alignment• Apr 2005 - Detailed design and public consultations• Sep 2005 - Apr 2006 - Obtain planning consents• Sep 2006 - Aug 2007 - Construction• Jan/Aug 2008 - Procure GWT Service• Aug/Sep 2008 - GWT startsFuture Phases• Phase 2a development work in progress• Phase 3 scoping to commence in 05/06Light Transport in <strong>London</strong>


ELT/GWT/TGB IntegrationELT/GWT/TGB IntegrationLight Transport in <strong>London</strong>