13.07.2015 Views

Reply of pre-bid meeting regarding selection of Independent ...

Reply of pre-bid meeting regarding selection of Independent ...

Reply of pre-bid meeting regarding selection of Independent ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S.No. Query <strong>Reply</strong> <strong>of</strong> MPRDC21 Highway Engineer: Table <strong>of</strong> Minimum Qualification : Page 32: No changeIt is seen that experience in highway projects has been indicated asminimum 10 years in planning, project <strong>pre</strong>paration, design <strong>of</strong> highwayprojects, It is submitted that this position is for supervision. It istherefore requested that the requirement <strong>of</strong> design be deleted.22 Bridge Engineer: Table <strong>of</strong> minimum qualification Page 32It is seen that experience in bridge projects has been indicated as No changeminimum 10 years in planning, project <strong>pre</strong>paration, design,construction./supervision <strong>of</strong> bridge project. It is submitted that thisposition is for supervision. It is therefore requested that the requirement<strong>of</strong> design be deleted.23 BOT contract specialists: Table <strong>of</strong> minimum qualification: page 34The essential educational qualification may please be corrected asGraduate in law or chartered accountant.Agreed. Word “<strong>of</strong>” be read as “or”.6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!