13.07.2015 Views

Reply of pre-bid meeting regarding selection of Independent ...

Reply of pre-bid meeting regarding selection of Independent ...

Reply of pre-bid meeting regarding selection of Independent ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

S.No. Query <strong>Reply</strong> <strong>of</strong> MPRDC11 Junior Technical Staff:Asstt. Highway Engineer, Asstt. Bridge Engineer, Asstt. MatgrialEngineer: para 2 <strong>of</strong> data sheet page 27& 35 <strong>of</strong> RFP.The following recommendation are made:a) Qualification <strong>of</strong> Diploma in Civil Engineering with 7/8 years No changeexperience should be accepted as approved by NHAI in similarprojectb) Nos. <strong>of</strong> such support personnel particularly for Asstt. Highway No changeEngineer and Asstt. Bridge Engineer should be at least 3 Nos. each.12 Age limit 65 years has been laid down for all personnel: Para No change3.2.3(vii) <strong>of</strong> LoI.: It is recommended that age limit <strong>of</strong> 70 years shouldbe accepted for key personnel. For support personnel this can be 65years.13 Letter <strong>of</strong> Invitation (LoI) Page 4 & 5 : While there is a mention shouldparticipation by Joint Venture, the LoI is silent about Association .No changePlease clarify if association with other firms are permissible.14 Methodology: Para 3.3 (iii) <strong>of</strong> LOI: Page 8 :The number <strong>of</strong> pages for the proposed methodology has not beenindicated. Normally in such cases a limit <strong>of</strong> 5 to 8 pages is indicated.You are requested to indicate the limit <strong>of</strong> the number <strong>of</strong> pages for theproposed methodology for execution <strong>of</strong> the assignment.15 Submission <strong>of</strong> proposal : Para 4.1 and 4.1.2. <strong>of</strong> LOI : Page 9 :In para 4.1 it is mentioned that the <strong>bid</strong>der must submit one originalproposal duly signed on every page . In para 4.1.2 it is mentioned thatthe original and each copy <strong>of</strong> the technical and financial proposalsmust be <strong>pre</strong>pared in indelible ink and must be signed by the authorizedre<strong>pre</strong>sentative. It is further mentioned that all pages <strong>of</strong> the technical andfinancial proposals must be initialed by the person signing he proposalThe requirements given in these para are contradictory. Normally, theoriginal proposals are <strong>pre</strong>pared in indelible ink and the covering letter(letter <strong>of</strong> transmittal) is signed by the authorized re<strong>pre</strong>sentative and allother pages are initialed. Thereafter, photo copies are taken <strong>of</strong> the dulyIt will be adjudged on the basis <strong>of</strong> quality<strong>of</strong> work rather than quantity <strong>of</strong> pages.Agreed.4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!