13.07.2015 Views

Network (VISN 21) - SAME Sacramento

Network (VISN 21) - SAME Sacramento

Network (VISN 21) - SAME Sacramento

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

VHA Construction and Maintenance ProgramsA New Face – Quick Reference Between ProgramsNon-Recurring Maintenance(NRM) ProjectsClinical Specific Initiatives(CSI) Projects Minor Construction Major ConstructionDescription: -Renovation, R repair, maintenance-Projects P j t expanding the existing-Projects P j t expanding the- Improvements toand modernization of the existing facility square footage existing facility square medical centers toinfrastructure within the existing -Design year 2013 and earlier footageprovide state-of-the artsquare feet; focuses on correcting the greater than $500,000 new - Design year 2013 and healthcare.Facility Condition Assessment, building space with exception of earlier greater than $500,000 - Does not require newensuring the medical center meets high cost equipment and donated new building space with building space can beapplicable codes, and modernizeswithin the existing constraints of theinfrastructure to comply with currentstandards of care.-Stand alone demolition- New surface parking and roads- New purely infrastructurebuildings and structures- Projects with design year 2013 andearlier up to $500,000 project costs forNew Building construction.building site prep which h do notrequire any new building space.- Starting in design year 2014and beyond greater than 1000 sfof new building space withexception of High-tech/High-costmedical equipment DonatedBuilding Site Preparation whichdon’t require any new buildingspace.-Projects addressing workloadexception of seismic i whichhcan be 100% renovation.- Design year 2014 andbeyond greater than 1000sf of new building spacewith exception of seismicwhich can be 100%renovation.-Projects addressingworkload gaps, seismicdeficiencies, and providingaccess to care for our100% renovation.- Starting with 2014 design year upgaps gp and providing access withinto 1000 sf of New Building space for the following VHA high profile veterans.all other space.categories:- Parking StructuresNote: Per the NRM definition pure Polytrauma- Seismic projects underutility/infrastructure buildings such as OIF/OEF$1M if not adding over 1000boiler plants, chiller plants, elevator Mental Healthsf new building space shouldtowers or stairwells are not consider High-tech/high costbe in the NRM program.New Building space so are notMedical Equipment Seismic projects over $1Mrestricted to the $500,000 project costs Installationsshould be in the Minoror 1000 sf New Building Space. Long-term careprogram. Women’s Health Donated Bldg Site PrepLower$25,000 $25,000 $25,000 $10,000,000000 000Limit:$5,000,000 $10,000,000 No upper limitUpper Limit: -Up to $10,000,000 for renovation ofexisting square footage;-No upper limit for pureutility/building system projects33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!