13.07.2015 Views

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RFP document for Independent Engineer for roads under Rewa DivisionDrawings and Documents received by it, including ‘as-built’Drawings, and keep them in its safe custody.11.5 Upon completion of its assignment hereunder, the IndependentEngineer shall duly classify and list all Drawings, Documents, results oftests and other relevant records, and hand them over to the Authority orsuch other person as the Authority may specify, and obtain written receiptthereof. Two copies of the said documents shall also be furnished inmicro film form or in such other medium as may be acceptable toMPRDC.12. PER<strong>FOR</strong>MANCE CLAUSEIndependent Engineers shall be expected to fully comply with all theprovisions of the `Terms of Reference’, and shall be fullyresponsible for supervising the Designs, Construction and maintenanceand operation of the facility takes place in accordance with the provisionsof the Concession Agreement and other schedules. Any failure of theIndependent Consultant in notifying to MPRDC and theConcessionaire on non-compliance of the provisions of the ConcessionAgreement and other schedules by the Concessionaire, nonadherenceto the provision of ToR and non- adherence to the timeschedule prescribed under ToR shall amount to nonperformance.The Independent Engineer shall appoint its authorized representative,who shall issue on behalf of the IE, the Provisional CompletionCertification and Completion Certificate along with the Team Leaderand shall carry out any such task as may be decided by MPRDC.The IE shall take prior approval of MPRDC before issuingProvisional Completion Certification and Completion Certificate.The proposal submitted shall also include thename of the authorized representative along with theauthorization letter and power of attorney.13. CONSULTANT’S <strong>PROPOSAL</strong>13.1 List of key personnel to be fielded by the Consultants shall be as below:i. Team Leader -cum -Senior Highway Engineerii. Bridge Design –cum-Bridge Engineeriii. Highway Design-cum -Pavement Engineer51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!