13.07.2015 Views

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RFP document for Independent Engineer for roads under Rewa Division17.7.6.10 The Independent Engineer shall monitor and review the curing ofdefects and deficiencies by the Concessionaire as set forth in Clause 19.4.6.11 In the event that the Concessionaire notifies the IndependentEngineer of any modifications that it proposes to make to the ProjectHighway, the Independent Engineer shall review the same and send itscomments to the Authority and the Concessionaire within 15 (fifteen)days of receiving the proposal.6.12 The Independent Engineer shall undertake traffic sampling, as and whenrequired by the MPRDC, under and in accordance with Article 22 andSchedule-O.7 Termination7.1 At any time, not earlier than 90 (ninety) days prior to Termination but notlater than 10 (ten) days prior to such Termination, the IndependentEngineer shall, in the presence of a representative of the Concessionaire,inspect the Project Highway for determining compliance by theConcessionaire with the Divestment Requirements set forth in Clause38.1 and, if required, cause tests to be carried out at theConcessionaire’s cost for determining such compliance. If theIndependent Engineer determines that the status of the Project Highwayis such that its repair and rectification would require a larger amountthan the sum set forth in Clause 39.2, it shall recommend retentionof the required amount in the Escrow Account and the period of retentionthereof.7.2 The Independent Engineer shall inspect the Project Highway once inevery 15 (fifteen) days during a period of 90 (ninety) days afterTermination for determining the liability of the Concessionaire underArticle 39, in respect of the defects or deficiencies specified therein. Ifany such defect or deficiency is found by the Independent Engineer, itshall make a report in reasonable detail and send it forthwith to theAuthority and the Concessionaire.8 Determination of costs and time8.1 The Independent Engineer shall determine the costs, and/or theirreasonableness, that are required to be determined by it under the49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!