13.07.2015 Views

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RFP document for Independent Engineer for roads under Rewa Divisiondetermine the extension of dates set forth in the Project CompletionSchedule, to which the Concessionaire is reasonably entitled, and shallnotify the Authority and the Concessionaire of the same.5.13 The Independent Engineer shall carry out, or cause to be carried out,all the Tests specified in Schedule-I and issue a Completion Certificateor Provisional Certificate, as the case may be. For carrying out itsfunctions under this Paragraph 5.13 and all matters incidental thereto, theIndependent Engineer shall act under and in accordance with theprovisions of Article 14 and Schedule-I.5.14 Upon reference from the Authority, the Independent Engineer shall makea fair and reasonable assessment of the costs of providing information,works and services as set forth in Article 16 and certify thereasonableness of such costs for payment by the Authority to theConcessionaire.5.15 The Independent Engineer shall aid and advise the Concessionaire inpreparing the Maintenance Manual.6 Operation Period6.1 In respect of the Drawings, Documents and Safety Report received by theIndependent Engineer for its review and comments during the OperationPeriod, the provisions of Paragraph 4 shall apply, mutatis mutandis.6.2 The Independent Engineer shall review the annual MaintenanceProgramme furnished by the Concessionaire and send its commentsthereon to the Authority and the Concessionaire within 15 (fifteen) daysof receipt of the Maintenance Programme.6.3 The Independent Engineer shall review the monthly status reportfurnished by the Concessionaire and send its comments thereon to theAuthority and the Concessionaire within 7 (seven) days of receipt of suchreport.6.4 The Independent Engineer shall inspect the Project Highway onceevery month, preferably after receipt of the monthly status report fromthe Concessionaire, but before the 20th (twentieth) day of each month inany case, and make out an O&M Inspection Report setting forth anoverview of the status, quality and safety of O&M including its47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!