13.07.2015 Views

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

REQUEST FOR PROPOSAL - Madhya Pradesh Road Development ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RFP document for Independent Engineer for roads under Rewa DivisionConcessionaire for its own quality assurance in accordance with GoodIndustry Practice.5.8 In the event that the Concessionaire carries out any remedial works forremoval or rectification of any defects or deficiencies, the IndependentEngineer shall require the Concessionaire to carry out, or cause to becarried out, tests to determine that such remedial works have broughtthe Construction Works into conformity with the Specifications andStandards, and the provisions of this Paragraph 5 shall apply to such tests.5.9 In the event that the Concessionaire fails to achieve any of the ProjectMilestones, the Independent Engineer shall undertake a review of theprogress of construction and identify potential delays, if any. If theIndependent Engineer shall determine that completion of the ProjectHighway is not feasible within the time specified in the Agreement,it shall require the Concessionaire to indicate within 15 (fifteen) days thesteps proposed to be taken to expedite progress, and the period withinwhich the Project Completion Date shall be achieved. Upon receipt of areport from the Concessionaire, the Independent Engineer shall review thesame and send its comments to the Authority and the Concessionaireforthwith.5.10 If at any time during the Construction Period, the Independent Engineerdetermines that the Concessionaire has not made adequate arrangementsfor the safety of workers and Users in the zone of construction or thatany work is being carried out in a manner that threatens the safety ofthe workers and the Users, it shall make a recommendation to theAuthority forthwith, identifying the whole or part of the ConstructionWorks that should be suspended for ensuring safety in respect thereof.5.11 In the event that the Concessionaire carries out any remedial measures tosecure the safety of suspended works and Users, it may, by notice inwriting, require the Independent Engineer to inspect such works, andwithin 3 (three) days of receiving such notice, the Independent Engineershall inspect the suspended works and make a report to the Authorityforthwith, recommending whether or not such suspension may be revokedby the Authority.5.12 If suspension of Construction Works is for reasons notattributable to the Concessionaire, the Independent Engineer shall46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!