UFC 3-280-02A Hazardous Waste Land Disposal/Land Treatment ...
UFC 3-280-02A Hazardous Waste Land Disposal/Land Treatment ... UFC 3-280-02A Hazardous Waste Land Disposal/Land Treatment ...
BIBLIOGRAPHYTM 5-814-7Braunstein, J., 1973. Underground Waste Managementand Artificial Recharge, Vol. 2, AmericanAssociation of Petroleum Geologists.Brown, K. W., June 1983. Landfills in the Future. PublicWorks, 200 South Boward Street, Ridgewood, NewJersey 07451.Cedergren, Harry R., 1977. Seepage, Drainage andFlow Nets, John Wiley and Sons, Inc., One WileyDrive, Somerset, New Jersey 08873.Cheremisinoff, N. P., P. N. Cheremisinoff, F.Ellerbusch, A. J. Perna, 1979. Industrial andHazardous Wastes Impoundment. Ann ArborScience.Collins, T. G. and Newkirk, D. D., 1982. The Use ofGeotextile Fabrics in Pond Construction Beneath anImpermeable Membrane. Crown ZellerbachCorporation, Northeast 4th and Adams Street,Camas, Washington 98607.Cook, T. D., ed., 1972. Underground WasteManagement and Environment Implications.American Association of Petroleum Geologists.EMCON Associates, 1980. Methane Generation andRecovery from Landfills. Ann Arbor Science, 10Tower Office Park, Woburn, Massachusetts 01801.Engineering Science, May 1982. ComparativeEvaluation of Incinerators and Landfills. EngineeringScience, Inc., 150 N. Santa Anita Avenue, Arcadia,California 91006.Freeze, R. A. and J. A. Cherry, 1979. Groundwater.Prentice-Hall, Inc., Englewood Cliffs, New Jersey07632.Geraghty and Miller, Inc., 1982. Guidance Document onMechanical Integrity Testing of Injection Wells.Geraghty and Miller, Inc., North Shore Atrium,Bibliography -16800 Jericho Turnpike, Syosset, New York 11791.Geraghty and Miller, Inc. and Booz, Allen and Hamilton,Inc., 1982. Injection Well Construction Practices andTechnology. Geraghty and Miller, Inc., North ShoreAtrium, 6800 Jericho Turnpike, Syosset, New York11791.Kays, W. B., 1977. Construction of Linings forReservoirs, Tanks, and Pollution Control Facilities.John Wiley and Sons, Inc., One Wiley Drive,Somerset, New Jersey 08873.National Water Well Association, 1982. AquiferRestoration and Ground-Water Rehabilitation,Proceedings of the Second National Symposium onAquifer Restoration and Ground-Water Monitoring.National Water Well Association, 500 W. WilsonBridge Road, Worthington, Ohio 43085.Overcash, M. R. and D. Pal, 1981. Design of LandTreatment Systems for Industrial Wastes-Theory andPractice. Ann Arbor Science, 230 Collingwood, P.O.Box 1425, Ann Arbor, Michigan 48105.Parr, J. F., Marsh, P. B., and J. M. Kla, 1983. LandTreatment of Hazardous Wastes. Noyes DataCorporation, Mill Road at Grand Avenue, ParkRidge, New Jersey 07656.Rankilor, P. R., 1981. Membranes in GroundEngineering. John Wiley and Sons, Inc., One WileyDrive, Somerset, New Jersey 08873.Sittig, M., 1979. Landfill Disposal of Hazardous Wastesand Sludges. Noyes Data Corporation.Yrjanainen, G., July 1975. "Sediment Basin Design,"Water and Sewage Works, University Micro FilmsInternational, 300 N. Zeeb Road, Department PR,Ann Arbor, Michigan 48106.CANCELLED
The proponent agency of this publication is the Office of the Chief of Engineers, United States Army.Users are invited to send comments and suggested improvements on DA Form 2028 (RecommendedChanges to Publications and Blank Forms) direct to HQDA DAEN-ECE-G), WASH DC 20314.TM 5-814-7By Order of the Secretary of the Army:Official:ROBERT M. JOYCEMajor General, United States ArmyThe Adjutant GeneralE. C. MEYERGeneral, United States ArmyChief of StaffDistribution:To be distributed in accordance with DA Form 12-34B, TM 5-800 Series: Requirements, for ENGINEERING ANDDESIGN FOR REAL PROPERTY FACILITIES.* U.S. GOVERNMENT PRINTING OFFICE: 1984-461-028:10038CANCELLED
- Page 33 and 34: TM 5-814-7of preventing migration o
- Page 35 and 36: priate coatings would be a suitable
- Page 37 and 38: TM 5-814-7Figure 6-3. Base liner de
- Page 39 and 40: Table 6-2-Summary of Liner Types-Co
- Page 41 and 42: TM 5-814-7Figure 6-4. Typical clay
- Page 43 and 44: Table 6-4. Requirements for Leachat
- Page 45 and 46: conductivity of the drainage layer
- Page 47 and 48: TM 5-814-7Figure 6-6. Typical run-o
- Page 49 and 50: TM 5-814-7Figure 6-8. Typical run-o
- Page 51 and 52: TM 5-814-7Figure 6-9. Run-on sedime
- Page 53 and 54: tems is the gas flow rate. Flow rat
- Page 55 and 56: 6-24sure covers is provided in EPA
- Page 57 and 58: Table 6- 7. Requirements for Specia
- Page 59 and 60: CHAPTER 7OPERATIONS AND CONTINGENCY
- Page 61 and 62: TM 5-814-7tending into the area of
- Page 63 and 64: ing hydrogeologic conditions are de
- Page 65 and 66: TM 5-814-7CANCELLEDFigure 8-2. Moni
- Page 67 and 68: CHAPTER 9TM 5-814-79-1. Introductio
- Page 69 and 70: 10-1. Cost Elementsa. Cost elements
- Page 71 and 72: APPENDIX ATM 5-814-7Government Publ
- Page 73 and 74: TM 5-814-7Table B-I. Summary of RCR
- Page 75 and 76: APPENDIX CTM 5-814-7C-1. Purpose an
- Page 77 and 78: TM 5-814-7CANCELLEDC-3
- Page 79: (c) Based upon these calculations,
- Page 83 and 84: CANCELLEDPIN: 057162
- Page 85: UFC 3-280-02A16 January 2004FOREWOR
BIBLIOGRAPHYTM 5-814-7Braunstein, J., 1973. Underground <strong>Waste</strong> Managementand Artificial Recharge, Vol. 2, AmericanAssociation of Petroleum Geologists.Brown, K. W., June 1983. <strong>Land</strong>fills in the Future. PublicWorks, 200 South Boward Street, Ridgewood, NewJersey 07451.Cedergren, Harry R., 1977. Seepage, Drainage andFlow Nets, John Wiley and Sons, Inc., One WileyDrive, Somerset, New Jersey 08873.Cheremisinoff, N. P., P. N. Cheremisinoff, F.Ellerbusch, A. J. Perna, 1979. Industrial and<strong>Hazardous</strong> <strong>Waste</strong>s Impoundment. Ann ArborScience.Collins, T. G. and Newkirk, D. D., 1982. The Use ofGeotextile Fabrics in Pond Construction Beneath anImpermeable Membrane. Crown ZellerbachCorporation, Northeast 4th and Adams Street,Camas, Washington 98607.Cook, T. D., ed., 1972. Underground <strong>Waste</strong>Management and Environment Implications.American Association of Petroleum Geologists.EMCON Associates, 1980. Methane Generation andRecovery from <strong>Land</strong>fills. Ann Arbor Science, 10Tower Office Park, Woburn, Massachusetts 01801.Engineering Science, May 1982. ComparativeEvaluation of Incinerators and <strong>Land</strong>fills. EngineeringScience, Inc., 150 N. Santa Anita Avenue, Arcadia,California 91006.Freeze, R. A. and J. A. Cherry, 1979. Groundwater.Prentice-Hall, Inc., Englewood Cliffs, New Jersey07632.Geraghty and Miller, Inc., 1982. Guidance Document onMechanical Integrity Testing of Injection Wells.Geraghty and Miller, Inc., North Shore Atrium,Bibliography -16800 Jericho Turnpike, Syosset, New York 11791.Geraghty and Miller, Inc. and Booz, Allen and Hamilton,Inc., 1982. Injection Well Construction Practices andTechnology. Geraghty and Miller, Inc., North ShoreAtrium, 6800 Jericho Turnpike, Syosset, New York11791.Kays, W. B., 1977. Construction of Linings forReservoirs, Tanks, and Pollution Control Facilities.John Wiley and Sons, Inc., One Wiley Drive,Somerset, New Jersey 08873.National Water Well Association, 1982. AquiferRestoration and Ground-Water Rehabilitation,Proceedings of the Second National Symposium onAquifer Restoration and Ground-Water Monitoring.National Water Well Association, 500 W. WilsonBridge Road, Worthington, Ohio 43085.Overcash, M. R. and D. Pal, 1981. Design of <strong>Land</strong><strong>Treatment</strong> Systems for Industrial <strong>Waste</strong>s-Theory andPractice. Ann Arbor Science, 230 Collingwood, P.O.Box 1425, Ann Arbor, Michigan 48105.Parr, J. F., Marsh, P. B., and J. M. Kla, 1983. <strong>Land</strong><strong>Treatment</strong> of <strong>Hazardous</strong> <strong>Waste</strong>s. Noyes DataCorporation, Mill Road at Grand Avenue, ParkRidge, New Jersey 07656.Rankilor, P. R., 1981. Membranes in GroundEngineering. John Wiley and Sons, Inc., One WileyDrive, Somerset, New Jersey 08873.Sittig, M., 1979. <strong>Land</strong>fill <strong>Disposal</strong> of <strong>Hazardous</strong> <strong>Waste</strong>sand Sludges. Noyes Data Corporation.Yrjanainen, G., July 1975. "Sediment Basin Design,"Water and Sewage Works, University Micro FilmsInternational, 300 N. Zeeb Road, Department PR,Ann Arbor, Michigan 48106.CANCELLED