13.07.2015 Views

Draft Environmental Impact Assessment Report - Meghalaya State ...

Draft Environmental Impact Assessment Report - Meghalaya State ...

Draft Environmental Impact Assessment Report - Meghalaya State ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Executive Summary<strong>Environmental</strong> ConcernsMitigation Measureswill be regularly maintained to ensure that the pollutionemission levels conform to the SPCB norms.During operation by improving intersections; by removingtraffic bottlenecks; by maintaining a steady stream flow oftrafficLocationsNoisePollutionIncrease in noise due toconstruction activity butwould be for short termDuring operation period dueto increase in trafficThe plants and equipment used in construction will strictlyconform to the GoI noise standards.All vehicles and equipment used in construction will be fittedwith exhaust silencers. The noise from the equipment mustcomply with the relevant legislation for levels of soundemission.Workers in vicinity of loud noise, and workers working with orin crushing, compaction, concrete mixing operation will wearearplugs.All activities pertaining to procurement, storage, transport andhandling of explosives and subsequent blasting will be carriedout as per the statutory Indian Explosives Act 1984. Cuttingwill be restricted only to daytime hours. Prior information ofblasting operational times (if any) shall be given to peopleliving near such blasting sites.Construction sites andcamps; sitewherecuttingwould becarried outSensitiveland useslikeschoolsandhospitalswill feel theexposuremoreConstruction activity shall not be carried out at nightCamps shall be 1000m away from settlementSignage, speed barriers to be provided at sensitive areas likeschools, hospitals.Slope correction and improved geometry will help in reductionof noise.Landslide1.8 lakh m 3 of hard and soft rockcutting is involved for 150 to200mm lateral depth on the hillRetaining wall of 20.49 km has been proposed along withextension of 5m height wall for 4.63 km. Gabion wall of 2 mheight for 2.98 km and that at slope protection work for 385mLandslideprone zones as<strong>Draft</strong> <strong>Environmental</strong> <strong>Impact</strong> <strong>Assessment</strong>Es - viii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!