REV C (10-01-10)INSTALLATION MANUAL – D54. Support the V-frame base with two bottle jacks to lift the load off the outer skids, andthen secure the center skid to the concrete pier.NOTE: Steps 5 through 8 discuss cylinder verticality.5. Measure the side-to side and front and back verticality of the pump using a 2-footmagnetic bubble level. Place the bubble level on the cylinder wall, and also on anotherlocation, such as a smooth vertical surface on the bottom cap. See Figure 42.Figure 42. Cylinder Alignment: Verticality6. If the cylinder is not vertical, rotate the adjustable feet on each base leg as required tobring the cylinder to the vertical position. See Figure 43.Bubble levelAdjustmentfootFigure 43. Cylinder Alignment: Verticality AdjustmentSECTION 5 – INSTALLATION31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!