REV C (10-01-10)INSTALLATION MANUAL – D516. Slowly open the fill/drain port. As the nitrogen bleeds off, the carrier bar will slowlymove down.17. Continue to bleed off the pressure until the rod string is supported by the clamp on thestuffing box.18. Continue to bleed off the nitrogen until the cylinder is fully retracted and the carrier bar ishanging, supported by the wire rope.19. Loosen the clamp above the carrier bar. Slide it down until it is resting on the stuffingbox and then tighten to sustain the load.20. Reconnect the nitrogen bottle and fill hose to the fill port.21. Slowly add nitrogen, and continue to add as the rod string moves up until the load issupported by the carrier bar and top clamp.22. Remove the clamp below the carrier bar.23. At this point, the cylinder and rod string are spaced properly.SECTION 5 – INSTALLATION28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!