REV A (05-01-09)INSTALLATION MANUAL – D5Power Unit1. Load the hydraulic oil tank with 28 gallons for 25HP or 40 HP power unit systems of oil.2. Load the hydraulic oil tank with 10 gallons for systems with 15 or 25 HP power units ofoil. See Figure 32 for tank location.Hydraulictank fillFigure 32. Hydraulic Tank LocationTransportation of Assemblies to the SiteGeneral guidelines are as follows:NOTE:The ship kit box can be stored separately by the driver in a truck locationwhere it doesn't get damaged.• Load the assembled pumping unit on the trailer.• Place blocks on the trailer for the pumping unit to rest on.• Securely tie ropes or other fastening materials around the pipe and over the base. Make surethe ties are not binding on the cylinder.• Load the ladders and the skid system.• Load the power unit on the front of the trailer. The driver can tie down the power unit overthe top of the frame.SECTION 3 – TOOLS & SPECIAL EQUIPMENT21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!