REV A (05-01-09)INSTALLATION MANUAL – D524. Route cable around the second pulley, and continue the process of cable routing untilboth pulleys are wired (see Figure 26).Pulley #2RoutingFigure 26. Finalized Pulley Routing25. Tie off the cables using the wedge sockets and cable clamps to secure the cable to thecable weldment (see Figure 27).WedgeSocketCableClampFigure 27. Installing Wedge Sockets and Cable Clamps26. Install leveling feet to the base of unit and apply anti-seize grease (see Figure 28).Anti-seizecompoundFigure 28. Leveling Feet on BaseSECTION 3 – TOOLS & SPECIAL EQUIPMENT18