13.07.2015 Views

Denmark: Financial System Stability Assessment with reports on - IMF

Denmark: Financial System Stability Assessment with reports on - IMF

Denmark: Financial System Stability Assessment with reports on - IMF

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

48SubjectMain Findings and Recommended Corrective Acti<strong>on</strong> Plan- Lower the risks in the system by either implementing aloss-sharing and liquidity arrangement or lowering thepositi<strong>on</strong>s in the netting by setting lower maximumlimits for individual transacti<strong>on</strong>s and dividing thepayment flows effectively in batches during thesettlement day instead of c<strong>on</strong>centrating them in the firstnormal settlement cycle at 1:30 a.m.Assets for settlement (CP VI)- Take measures to prevent the booking of the retailpayments in the account of customers before thesettlement is final, as l<strong>on</strong>g as the settlement is notguaranteed by adequate risk management measures.Alternatively, the results of the ordinary clearing couldbe settled immediately after the processing is finished,whereup<strong>on</strong> the data <strong>on</strong> the underlying retail paymentscould be distributed (see above).SumclearingThe overseers of the system should:- Gather informati<strong>on</strong> <strong>on</strong> possible c<strong>on</strong>centrati<strong>on</strong> risk, theamounts settled and the deposit risk for the smallerbanks that use a specific settlement bank, and analyzethe c<strong>on</strong>sequences for smaller banks and the trust in thesystem in case of a default of <strong>on</strong>e of the largersettlement banks.Security and operati<strong>on</strong>al reliability; andc<strong>on</strong>tingency arrangements (CP VII)KRONOS- Coordinate the c<strong>on</strong>tingency plans of DanmarksNati<strong>on</strong>albank, BEC, VP, PBS, and develop aninfrastructure for broad testing of emergencyprocedures.- Re-negotiate <str<strong>on</strong>g>with</str<strong>on</strong>g> BEC the maximum restart time andagree to comply <str<strong>on</strong>g>with</str<strong>on</strong>g> the internati<strong>on</strong>al best practice oftwo hours.- Develop the securities analysis methodology developedby the ECB further and adapt it according to newinsights <str<strong>on</strong>g>with</str<strong>on</strong>g> respect to IT security.- Ensure that communicati<strong>on</strong> via the proprietary networkobserves internati<strong>on</strong>al standards <str<strong>on</strong>g>with</str<strong>on</strong>g> respect tointegrity.- Stress test all parts of the system adequately and ensuresufficient peak capacity.- Analyze the complexity of the system design and itsinteracti<strong>on</strong> <str<strong>on</strong>g>with</str<strong>on</strong>g> other systems of DanmarksNati<strong>on</strong>albank or of BEC and study how this complexity

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!