South Australian Mallee Fowl Survey Final Report 2011_12.pdf
South Australian Mallee Fowl Survey Final Report 2011_12.pdf
South Australian Mallee Fowl Survey Final Report 2011_12.pdf
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>2011</strong>/2012 <strong>Mallee</strong>fowl Monitoring in the SAMDB <strong>Final</strong> <strong>Report</strong>2.13 Murray Bridge army training range (MBAR) (s69) gridThe MBAR grid was surveyed on 2 November <strong>2011</strong> by Kevin Burrett, Michael Weinel, BillBoulton and RLB Ecology.A total of 42 mounds were surveyed and 8 of these mounds were active. This is the best resultever recorded for this grid. Six active mounds were recorded last season. The remaining 7mounds on this grid are not due for monitoring again until 2015._____________________________________________________________________________________________________<strong>Mallee</strong> Eco Services (March 2012) 13