13.07.2015 Views

High-Tech - ETA International

High-Tech - ETA International

High-Tech - ETA International

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Enphase also provides a communication gateway (Fig. 10) that plugs into a regular AC outlet.The communication gateway uses a standard Ethernet router to send the performance data to theEnphase website.<strong>ETA</strong> CA AwardedAdvisor of theMonth by NTHS!Figure 10. (Courtesy of Enphase Energy – www.enphaseenergy.com)Lilliputian Inverters Slay Array Problems Page 8The system performance data can then be observed usingany web browser (Fig. 11).The system performance data can then be observed using any web browser (Fig. 11).Figure 11. (Courtesy of Enphase Energy – www.enphaseenergy.com)Micro-inverter IssuesThere are concerns regarding the use of micro-inverters. First, each micro-inverter runs about$200 each. The system in Fig. 4 has 12 solar modules, which means an expenditure of $2400 toMicro-inverter IssuesThere are concerns regarding the use of micro-inverters. First,each micro-inverter runs about $200 each. The system inFig. 4 has 12 solar modules, which means an expenditure of$2400 to include one micro-inverter per module. The SunnyBoy 2100U inverter costs about $1250. This cost increasemust be contrasted with the micro-inverter architecture advantagesdescribed previously.include one micro-inverter per module. The Sunny Boy 2100U inverter costs about $1250. Thiscost increase must be contrasted with the micro-inverter architecture advantages describedpreviously.The micro-inverters (like the array) will be subjected to elevated temperatures. Electrolyticcapacitors suffer a reduced life when temperatures are elevated. Capacitor lifetime is verysensitive to temperature and follows the Arrhenius equation that states that useful life doubles forevery 10°C temperature drop. There is not a lot of field data at present to dispel possible failureconcerns. (Enphase Energy has published a white paper that suggests its capacitors have alifetime of 50 years.)The micro-inverters (like the array) will be subjected to elevatedtemperatures. Electrolytic capacitors suffer a reducedlife when temperatures are elevated. Capacitor lifetime is verysensitive to temperature and follows the Arrhenius equationthat states that useful life doubles for every 10°C temperaturedrop. There is not a lot of field data at present to dispel possiblefailure concerns. (Enphase Energy has published a whitepaper that suggests its capacitors have a lifetime of 50 years.)NEC 2008 article 490 for PV installations is written around the topology indicated in Fig. 5.Consequently, some interpretation is required for micro-inverter installations. This should bediscussed with the local authority having jurisdiction over the installation permits andinspections before beginning an installation.These issues will certainly be resolved in time. Costs will certainly come down as moremanufacturers become established. Field experience and technology improvements will alleviatefailure concerns, and NEC 2011 will probably address micro-inverter installations. The superiorapproach using micro-inverters cannot be denied.Lilliputian Inverters Slay Array Problems Page 9NEC 2008 article 490 for PV installations is written around thetopology indicated in Fig. 5. Consequently, some interpretationis required for micro-inverter installations. This shouldbe discussed with the local authority having jurisdiction overthe installation permits and inspections before beginning aninstallation.These issues will certainly be resolved in time. Costs will certainlycome down as more manufacturers become established.Field experience and technology improvements will alleviatefailure concerns, and NEC 2011 will probably address microinverterinstallations. The superior approach using micro-inverterscannot be denied. HTNThis month's featured advisor is Richard Karlowskyof Steel Center AVTS in Jefferson Hills, PA.Richard has been the Electronics Engineering Instructorfor 11 years.For the past four years, Steel Center NTHS membershave adopted the Greater Pittsburgh CommunityFood Bank as a community service project.Richard adds, "The sense of community and servicemy students receive can't be taught in a traditionalclassroom; so we take the classroom tothe people who need us."Richard is a CETsr with <strong>ETA</strong> <strong>International</strong>. He hasbeen a Certification Administrator since 2004.(This article was taken from the NTHS The Artisan newsletter)JAN/FEB2010 | etainternational.org | 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!