13.07.2015 Views

14. starptautiskā konference 2012 - Latvijas Jūras akadēmija

14. starptautiskā konference 2012 - Latvijas Jūras akadēmija

14. starptautiskā konference 2012 - Latvijas Jūras akadēmija

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Proceedings of 14th International conference „Maritime Transport and Infrastructure - <strong>2012</strong>”Directive 2009/28/EC of the European Parliament and of the Council on the promotion of the use ofenergy from renewable sources the renewable energy industry of the countries of the EU.According to the Directive 2009/28/EC all type of renewable energy (including electricity,transport and heating) proportion must be at least 20% of all the consumed energy [6] until 2020, thuswind energy has a substantial significance in reaching the goals of the new energy policy. For Latvia,in accordance with Directive 2009/28/EC Annex I, the main goal till 2020 is to produce renewableenergy in an amount that is equal to 40% of total consumed energy. In 2009 total proportion ofrenewable energy resources is 34,3%, but in 2010 - 32,5%.In compliance with law of 28 October 2010 “Marine Environment Protection andManagement Law” [3] maritime spatial planning (MSP) is a long-term process for developmentplanning aimed at protection of marine environment, rational use of the sea and integratedmanagement, as well as balancing the social welfare and economic development with theenvironmental protection requirements. The main goal of MSP is a marine spatial zoning plan thatidentifies and manages existing and potential interests of maritime spaces and its coasts in a mannerthat best meets the priorities and objectives set by the participants. Project “Development of Maritimespatial planning in the Baltic Sea” (BaltSeaPlan) is implemented from 2009 till <strong>2012</strong> in order tosupport the process of developing, introducing and implementing MSP in the Baltic Sea. There areseven countries: Germany, Poland, Denmark, Sweden, Estonia, Lithuania and Latvia. In LatviaBaltSeaPlan is implemented on the Western coast of Latvia in the Latvian territorial waters andexclusive economic zone from Nida till Ovisrags (total water area is about 20 000 km 2 ). Wind farmsare planned in eight areas:1. 12 nautical miles (nm) from Uzava in the reserved area;2. 12 nm from Jurkalne in the priority area;3. 12 nm from Pavilosta in the reserved area;4. 12 nm from Pavilosta and Ziemupe in the priority area;5. About 10 nm from Liepaja in the reserved area together with security and monitoring ofthe coast and 12 nm from Liepaja in the reserved area;6. About 8,5 nm from Bernati in the reserved area together with security and monitoring ofthe coast;7. 12 nm from Bernati in the priority area;8. And 12 nm from Pape in the reserved area.47-80 wind turbines are planned in the Western coast of Latvia. The total budget is about 500– 600 million euro for wind park construction in the Western coast of Latvia. The project is funded bythe EU Baltic Sea Region Programme and part-financed by the European Union (European RegionalDevelopment Fund). The total power of wind parks is estimated about 200 MW, generating 590-910thousands MW electricity per year.Notwithstanding maritime spatial planning in the beginning of year <strong>2012</strong> there are still nowind farms on the coast of Courland, because the opportunity to implement wind generators in the seais delayed by absence of legislative framework. Research must be made before commencing theconstruction of offshore wind power plants, but at the beginning of year <strong>2012</strong> the legislation of Latviadoes not allow any research by the state-owned energy company “Augstsprieguma tikli”, which wasattempted to be delegated to do research on potential wind farm sites by the Ministry of Economy, norby any other companies.By the end of the year 2011 there were 37 operational wind farms in Latvia with total powerof 31 MW, which all are installed on shores or inland (Table 1): 19 of the wind farms are operatingwith output power greater than 0.25 MW, 18 are operating with less then 0.25 MW [5]. The first windgenerators were installed in Ainazi, other wind generators are located in Sarnate, near Liepaja, inUzava, in Gluda Jelgava district, Vircava Kandava district, and there output power varied from 1 to 30MW. There are no wind power plants on the Courland coast of Latvia thus the possibilities ofrenewable energy on the coast of Courland are not fully utilized. Compared to the power output of itsneighboring countries Estonia and Lithuania (Table 1), respectively 184 MW and 179 MW, Latviawith its power of 31MW is very behind.53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!