VISN 16 - First 3 Project TypesVAMC COST GUIDE - BUILDING TYPEVISN 16: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: Office of Construction & Facilities Management, Cost Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Medical Center Ambulatory Care Clinical ImprovementsNewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovationAlexandria, LA (Baton Rouge, LA) $326 $254 $165 $87 $282 $220 $143 $75 $317 $246 $160 $84Biloxi, MS $302 $236 $153 $81 $262 $204 $133 $70 $294 $228 $148 $78Fayetteville, AR (Fort Smith, AR) $328 $256 $166 $87 $284 $221 $144 $76 $319 $247 $161 $84Houston, TX $345 $269 $175 $92 $298 $233 $151 $79 $336 $260 $169 $89Jackson, MS $299 $233 $152 $80 $259 $202 $131 $69 $291 $226 $147 $77Little Rock, AR $324 $253 $164 $86 $280 $219 $142 $75 $315 $244 $159 $83Muskogee, OK (Tulsa, OK) $342 $267 $174 $91 $296 $231 $150 $79 $333 $258 $168 $88New Orleans, LA $337 $263 $171 $90 $292 $228 $148 $78 $328 $254 $165 $87North Little Rock, AR (Little Rock, AR) $324 $253 $164 $86 $280 $219 $142 $75 $315 $244 $159 $83Oklahoma City, OK $342 $267 $174 $91 $296 $231 $150 $79 $333 $258 $168 $88Shreveport, LA $320 $250 $163 $85 $277 $216 $141 $74 $312 $242 $157 $82$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:Costs shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; and current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading and phasing, etc.Federally mandated Physical Security, Sustainability, and Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security standards allow additional funds for increased site utility requirements and protective features outside the building line.Site work and site utility costs will vary greatly for each project. Early identification of requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule of thumb for site work and site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probablebid competition; availability of labor, materials, and equipment; and impacts of national and international markets.For additional assistance, contact estimating@va.govPage 1

<strong>VISN</strong> <strong>16</strong> - First 3 Project Types<strong>VAMC</strong> COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>16</strong>: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Medical Center Ambulatory Care Clinical ImprovementsNewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovationAlex<strong>and</strong>ria, LA (Baton Rouge, LA) $326 $254 $<strong>16</strong>5 $87 $282 $220 $143 $75 $317 $246 $<strong>16</strong>0 $84Biloxi, MS $302 $236 $153 $81 $262 $204 $133 $70 $294 $228 $148 $78Fayetteville, AR (Fort Smith, AR) $328 $256 $<strong>16</strong>6 $87 $284 $221 $144 $76 $319 $247 $<strong>16</strong>1 $84Houston, TX $345 $269 $175 $92 $298 $233 $151 $79 $336 $260 $<strong>16</strong>9 $89Jackson, MS $299 $233 $152 $80 $259 $202 $131 $69 $291 $226 $147 $77Little Rock, AR $324 $253 $<strong>16</strong>4 $86 $280 $219 $142 $75 $315 $244 $159 $83Muskogee, OK (Tulsa, OK) $342 $267 $174 $91 $296 $231 $150 $79 $333 $258 $<strong>16</strong>8 $88New Orleans, LA $337 $263 $171 $90 $292 $228 $148 $78 $328 $254 $<strong>16</strong>5 $87North Little Rock, AR (Little Rock, AR) $324 $253 $<strong>16</strong>4 $86 $280 $219 $142 $75 $315 $244 $159 $83Oklahoma City, OK $342 $267 $174 $91 $296 $231 $150 $79 $333 $258 $<strong>16</strong>8 $88Shreveport, LA $320 $250 $<strong>16</strong>3 $85 $277 $2<strong>16</strong> $141 $74 $312 $242 $157 $82$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:<strong>Cost</strong>s shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probablebid competition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 1


<strong>VISN</strong> <strong>16</strong>- Second 3 Project Types<strong>VAMC</strong> COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>16</strong>: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Bed Tower Replacement Domiciliary Community Based Outpatient Clinic (CBOC)NewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovationAlex<strong>and</strong>ria, LA (Baton Rouge, LA) $336 $269 $175 $92 $195 $134 $87 $46 $269 $207 $134 $71Biloxi, MS $312 $250 $<strong>16</strong>2 $85 $181 $124 $81 $42 $250 $192 $125 $66Fayetteville, AR (Fort Smith, AR) $339 $271 $176 $92 $196 $135 $88 $46 $271 $208 $135 $71Houston, TX $356 $285 $185 $97 $206 $142 $92 $48 $285 $219 $142 $75Jackson, MS $309 $247 $<strong>16</strong>1 $84 $179 $123 $80 $42 $247 $190 $124 $65Little Rock, AR $334 $267 $174 $91 $194 $133 $86 $45 $267 $206 $134 $70Muskogee, OK (Tulsa, OK) $353 $283 $184 $96 $205 $140 $91 $48 $282 $217 $141 $74New Orleans, LA $348 $279 $181 $95 $202 $138 $90 $47 $278 $214 $139 $73North Little Rock, AR (Little Rock, AR) $334 $267 $174 $91 $194 $133 $86 $45 $267 $206 $134 $70Oklahoma City, OK $354 $283 $184 $97 $205 $141 $91 $48 $283 $218 $141 $74Shreveport, LA $331 $265 $172 $90 $192 $132 $86 $45 $265 $204 $132 $69$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:<strong>Cost</strong>s shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probablebid competition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 2


<strong>VISN</strong> <strong>16</strong> - Third 3 Project Types<strong>VAMC</strong> COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>16</strong>: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Acute Psychiatric Mental Health PolytraumaNewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovationAlex<strong>and</strong>ria, LA (Baton Rouge, LA) $334 $267 $173 $91 $276 $215 $140 $73 $318 $251 $<strong>16</strong>3 $86Biloxi, MS $310 $248 $<strong>16</strong>1 $84 $256 $200 $130 $68 $295 $233 $151 $79Fayetteville, AR (Fort Smith, AR) $336 $269 $175 $92 $278 $217 $141 $74 $320 $253 $<strong>16</strong>4 $86Houston, TX $353 $282 $183 $96 $292 $228 $148 $78 $337 $265 $172 $91Jackson, MS $307 $245 $159 $84 $254 $198 $128 $67 $292 $230 $150 $79Little Rock, AR $332 $265 $172 $90 $275 $214 $139 $73 $3<strong>16</strong> $249 $<strong>16</strong>2 $85Muskogee, OK (Tulsa, OK) $351 $280 $182 $96 $290 $226 $147 $77 $334 $263 $171 $90New Orleans, LA $346 $276 $179 $94 $286 $223 $145 $76 $329 $260 $<strong>16</strong>9 $89North Little Rock, AR (Little Rock, AR) $332 $265 $172 $90 $275 $214 $139 $73 $3<strong>16</strong> $249 $<strong>16</strong>2 $85Oklahoma City, OK $351 $280 $182 $96 $290 $226 $147 $77 $334 $264 $171 $90Shreveport, LA $329 $262 $171 $90 $272 $212 $138 $72 $313 $247 $<strong>16</strong>0 $84$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:<strong>Cost</strong>s shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probablebid competition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 3


<strong>VISN</strong> <strong>16</strong>- Fourth 3 Project Types<strong>VAMC</strong> COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>16</strong>: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Spinal Cord Injury (SCI) Nursing Home Care Unit (NHCU) Blind RehabilitationNewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovationAlex<strong>and</strong>ria, LA (Baton Rouge, LA) $291 $219 $142 $75 $266 $212 $138 $72 $289 $220 $143 $75Biloxi, MS $270 $204 $132 $69 $247 $197 $128 $67 $268 $205 $133 $70Fayetteville, AR (Fort Smith, AR) $293 $221 $144 $75 $268 $213 $139 $73 $291 $222 $144 $76Houston, TX $308 $232 $151 $79 $282 $224 $146 $76 $306 $233 $152 $80Jackson, MS $267 $201 $131 $69 $245 $195 $126 $66 $265 $203 $132 $69Little Rock, AR $289 $218 $142 $74 $265 $211 $137 $72 $287 $219 $143 $75Muskogee, OK (Tulsa, OK) $305 $230 $150 $79 $280 $222 $145 $76 $303 $232 $151 $79New Orleans, LA $301 $227 $148 $77 $276 $219 $143 $75 $299 $228 $148 $78North Little Rock, AR (Little Rock, AR) $289 $218 $142 $74 $265 $211 $137 $72 $287 $219 $143 $75Oklahoma City, OK $306 $230 $150 $79 $280 $223 $145 $76 $304 $232 $151 $79Shreveport, LA $286 $2<strong>16</strong> $140 $74 $262 $208 $135 $71 $284 $217 $141 $74$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:<strong>Cost</strong>s shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probablebid competition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 4


<strong>VISN</strong> <strong>16</strong> - Fifth 3 Project Types<strong>VAMC</strong> COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>16</strong>: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Research - Heavy; Wet labs & Animals Surgery <strong>and</strong> PACU Research - Normal; Mix Heavy & <strong>Office</strong>sNewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovationAlex<strong>and</strong>ria, LA (Baton Rouge, LA) $504 $429 $279 $146 $447 $366 $238 $125 $364 $309 $201 $105Biloxi, MS $468 $398 $259 $136 $415 $340 $221 $1<strong>16</strong> $338 $287 $186 $98Fayetteville, AR (Fort Smith, AR) $508 $432 $281 $147 $451 $369 $240 $126 $367 $311 $202 $106Houston, TX $534 $454 $295 $155 $473 $388 $252 $132 $385 $327 $212 $111Jackson, MS $463 $394 $256 $134 $411 $336 $219 $115 $334 $284 $184 $97Little Rock, AR $502 $426 $277 $145 $445 $364 $237 $124 $362 $307 $200 $105Muskogee, OK (Tulsa, OK) $530 $450 $293 $154 $470 $385 $250 $131 $382 $324 $211 $111New Orleans, LA $522 $444 $289 $151 $463 $379 $247 $129 $377 $320 $208 $109North Little Rock, AR (Little Rock, AR) $502 $426 $277 $145 $445 $364 $237 $124 $362 $307 $200 $105Oklahoma City, OK $530 $451 $293 $154 $470 $385 $250 $131 $383 $325 $211 $111Shreveport, LA $496 $422 $274 $144 $440 $360 $234 $123 $358 $304 $197 $104$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:<strong>Cost</strong>s shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probablebid competition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 5


<strong>VISN</strong> <strong>16</strong> - Sixth 3 Project Types<strong>VAMC</strong> COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>16</strong>: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Administration Space; Housed in Main Hospital Parking Garage Surface Parking - Priced Per Parking SpaceNewTotalRenovationMediumRenovationLightRenovation NewTotalRenovationMediumRenovationLightRenovation New SpaceAlex<strong>and</strong>ria, LA (Baton Rouge, LA) $205 $<strong>16</strong>0 $104 $55 $47 $21 $14 $7 $2,669 $0 $0 $0Biloxi, MS $191 $149 $97 $51 $44 $20 $13 $7 $2,479 $0 $0 $0Fayetteville, AR (Fort Smith, AR) $207 $<strong>16</strong>2 $105 $55 $48 $21 $14 $7 $2,689 $0 $0 $0Houston, TX $217 $170 $110 $58 $50 $22 $15 $8 $2,825 $0 $0 $0Jackson, MS $189 $147 $96 $50 $44 $19 $13 $7 $2,452 $0 $0 $0Little Rock, AR $204 $<strong>16</strong>0 $104 $54 $47 $21 $14 $7 $2,655 $0 $0 $0Muskogee, OK (Tulsa, OK) $2<strong>16</strong> $<strong>16</strong>9 $110 $58 $50 $22 $14 $8 $2,804 $0 $0 $0New Orleans, LA $213 $<strong>16</strong>6 $108 $57 $49 $22 $14 $7 $2,764 $0 $0 $0North Little Rock, AR (Little Rock, AR) $204 $<strong>16</strong>0 $104 $54 $47 $21 $14 $7 $2,655 $0 $0 $0Oklahoma City, OK $2<strong>16</strong> $<strong>16</strong>9 $110 $58 $50 $22 $14 $8 $2,807 $0 $0 $0Shreveport, LA $202 $158 $103 $54 $47 $21 $13 $7 $2,627 $0 $0 $0$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:<strong>Cost</strong>s shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probablebid competition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 6


<strong>VISN</strong> <strong>16</strong> - Seventh 3 Proj Types<strong>VAMC</strong> COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>16</strong>: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C)Date Prepared: JUNE, 2014LocationNewWarehouses -w/ <strong>Office</strong>sTotalRenovationMediumRenovationLightRenovationAlex<strong>and</strong>ria, LA (Baton Rouge, LA) $<strong>16</strong>0 $1<strong>16</strong> $75 $39 $0 $0 $0 $0 $0 $0 $0 $0Biloxi, MS $149 $107 $70 $37 $0 $0 $0 $0 $0 $0 $0 $0Fayetteville, AR (Fort Smith, AR) $<strong>16</strong>2 $117 $76 $40 $0 $0 $0 $0 $0 $0 $0 $0Houston, TX $170 $122 $80 $42 $0 $0 $0 $0 $0 $0 $0 $0Jackson, MS $147 $106 $69 $36 $0 $0 $0 $0 $0 $0 $0 $0Little Rock, AR $159 $115 $75 $39 $0 $0 $0 $0 $0 $0 $0 $0Muskogee, OK (Tulsa, OK) $<strong>16</strong>8 $121 $79 $41 $0 $0 $0 $0 $0 $0 $0 $0New Orleans, LA $<strong>16</strong>6 $120 $78 $41 $0 $0 $0 $0 $0 $0 $0 $0North Little Rock, AR (Little Rock, AR) $159 $115 $75 $39 $0 $0 $0 $0 $0 $0 $0 $0Oklahoma City, OK $<strong>16</strong>9 $122 $79 $42 $0 $0 $0 $0 $0 $0 $0 $0Shreveport, LA $158 $114 $74 $39 $0 $0 $0 $0 $0 $0 $0 $0$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0NOTES:<strong>Cost</strong>s shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Allow additional funds for known adverse sub-surface conditions, seismic, hurricane loading <strong>and</strong> phasing, etc.Federally m<strong>and</strong>ated Physical Security, Sustainability, <strong>and</strong> Energy Reduction requirements are INCLUDED in the building unit costs.For new sites that are required to meet Mission Critical security st<strong>and</strong>ards allow additional funds for increased site utility requirements <strong>and</strong> protective features outside the building line.Site work <strong>and</strong> site utility costs will vary greatly for each project. Early identification <strong>of</strong> requirements is critical.For conceptual estimates on projects up to $25M, 15% added building cost is a reasonable rule <strong>of</strong> thumb for site work <strong>and</strong> site utilities . Factor may decrease to 10% for larger projects.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probablebid competition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 7


<strong>VISN</strong> <strong>16</strong> - Eighth 3 Proj Types<strong>VAMC</strong> COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>16</strong>: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Demolition <strong>Cost</strong> for an Existing Building Leased Space - Need To Provide Specific Build-Out Operating <strong>and</strong> Mothball <strong>Cost</strong>sDemolition<strong>Cost</strong> OnlyHaul &DumpYearly RatePer SquareFoot"Full"Operational<strong>Cost</strong>sAdjacentMothball<strong>Cost</strong>sSt<strong>and</strong> AloneMothball<strong>Cost</strong>sAlex<strong>and</strong>ria, LA (Baton Rouge, LA) $8.63 $9.80 $0.00 $0.00 $30.71 $0.00 $0.00 $0.00 $19.01 $11.10 $5.11 $0.00Biloxi, MS $8.02 $9.10 $0.00 $0.00 $28.52 $0.00 $0.00 $0.00 $17.66 $10.30 $4.74 $0.00Fayetteville, AR (Fort Smith, AR) $8.70 $9.87 $0.00 $0.00 $30.94 $0.00 $0.00 $0.00 $19.15 $11.18 $5.14 $0.00Houston, TX $9.14 $10.37 $0.00 $0.00 $32.50 $0.00 $0.00 $0.00 $20.12 $11.74 $5.40 $0.00Jackson, MS $7.93 $9.00 $0.00 $0.00 $28.21 $0.00 $0.00 $0.00 $17.47 $10.19 $4.69 $0.00Little Rock, AR $8.59 $9.75 $0.00 $0.00 $30.54 $0.00 $0.00 $0.00 $18.91 $11.04 $5.08 $0.00Muskogee, OK (Tulsa, OK) $9.07 $10.29 $0.00 $0.00 $32.26 $0.00 $0.00 $0.00 $19.97 $11.66 $5.36 $0.00New Orleans, LA $8.94 $10.15 $0.00 $0.00 $31.81 $0.00 $0.00 $0.00 $19.69 $11.49 $5.29 $0.00North Little Rock, AR (Little Rock, AR) $8.59 $9.75 $0.00 $0.00 $30.54 $0.00 $0.00 $0.00 $18.91 $11.04 $5.08 $0.00Oklahoma City, OK $9.08 $10.30 $0.00 $0.00 $32.29 $0.00 $0.00 $0.00 $19.99 $11.67 $5.37 $0.00Shreveport, LA $8.49 $9.64 $0.00 $0.00 $30.22 $0.00 $0.00 $0.00 $18.71 $10.92 $5.02 $0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00NOTES:<strong>Cost</strong>s shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions."Demolition <strong>Cost</strong>s Only" is based on razing the entire structure <strong>and</strong> disposing <strong>of</strong> the waste material on-site. Haul & Dump is not included. Hazardous material abatement is not included."Haul & Dump" includes cost for a 20 mile haul <strong>and</strong> the appropriate dump fees for construction materials. Disposal <strong>of</strong> hazardous materials is not included.Additional funds should be included for known adverse conditions, length <strong>of</strong> haul, inflated dump fees, closed dump <strong>and</strong> refuge facilitiesTo calculate savings for mothballed structures, subtract which type <strong>of</strong> "Mothballing" is being utilized (Adjacent or St<strong>and</strong> Alone) from the "Full" Operating <strong>Cost</strong>s.The "Full" Operating <strong>Cost</strong>s include: Electric, water, gas, sewage, major systems maintenance, building shell maintenance, janitorial, <strong>and</strong> securityBased on the type <strong>of</strong> "Mothballing" to be used, percentages have been utilized to account for maintaining the integrity <strong>of</strong> the building envelope,maintaining non-freezing conditions for sprinklers & utilities, maintenance, security, <strong>and</strong> ensuring JHCO complianceLeasing yearly rates only includes: l<strong>and</strong>, site improvements, building shell, taxes, utilities, insurance, shell <strong>and</strong> outside maintenance -Similar to a sole occupancy <strong>of</strong> a "Spec" building - HOUSEKEEPING COSTS ARE NOT INCLUDED - Assumes normal operating days <strong>and</strong> hours - NOT 24/7Lease cost does not include initial build out (tenant improvement) <strong>of</strong> space for the specific function.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probable bidcompetition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 8


<strong>VISN</strong> <strong>16</strong> - Ninth 3 Project Types<strong>VAMC</strong> COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>16</strong>: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C)Date Prepared: JUNE, 2014Location Ro<strong>of</strong> Replacement Modernize Restrooms for UFAS/ADA Fire AlarmsTotalTotalEDPM Built Up Shingles Metal RenovationNew RenovationAlex<strong>and</strong>ria, LA (Baton Rouge, LA) $8.26 $7.88 $5.06 $6.65 $206.10 $0.00 $0.00 $0.00 $7.09 $8.34 $0.00 $0.00Biloxi, MS $7.67 $7.32 $4.70 $6.17 $191.38 $0.00 $0.00 $0.00 $6.59 $7.75 $0.00 $0.00Fayetteville, AR (Fort Smith, AR) $8.32 $7.94 $5.10 $6.70 $207.61 $0.00 $0.00 $0.00 $7.15 $8.40 $0.00 $0.00Houston, TX $8.74 $8.34 $5.36 $7.04 $218.09 $0.00 $0.00 $0.00 $7.51 $8.83 $0.00 $0.00Jackson, MS $7.58 $7.24 $4.65 $6.11 $189.34 $0.00 $0.00 $0.00 $6.52 $7.67 $0.00 $0.00Little Rock, AR $8.21 $7.84 $5.03 $6.61 $204.98 $0.00 $0.00 $0.00 $7.06 $8.30 $0.00 $0.00Muskogee, OK (Tulsa, OK) $8.67 $8.28 $5.32 $6.98 $2<strong>16</strong>.50 $0.00 $0.00 $0.00 $7.45 $8.76 $0.00 $0.00New Orleans, LA $8.55 $8.<strong>16</strong> $5.24 $6.89 $213.44 $0.00 $0.00 $0.00 $7.35 $8.64 $0.00 $0.00North Little Rock, AR (Little Rock, AR) $8.21 $7.84 $5.03 $6.61 $204.98 $0.00 $0.00 $0.00 $7.06 $8.30 $0.00 $0.00Oklahoma City, OK $8.68 $8.28 $5.32 $6.99 $2<strong>16</strong>.70 $0.00 $0.00 $0.00 $7.46 $8.77 $0.00 $0.00Shreveport, LA $8.12 $7.75 $4.98 $6.54 $202.80 $0.00 $0.00 $0.00 $6.98 $8.21 $0.00 $0.00$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00NOTES:<strong>Cost</strong>s shown are for building construction only. Additional costs to be considered include: Pre-Design allowance; escalation to contract award date; construction contingencies;technical services; impact costs; utility agreements; site improvements; site utilities; CM fees; <strong>and</strong> current local market conditions.Ro<strong>of</strong> replacement costs do not include asbestos removal or disposal. Verify presence <strong>of</strong> asbestos in existing ro<strong>of</strong> <strong>and</strong> include additional funds as necessary.MARKET CONDITIONS:Changes in market conditions will impact pricing. Estimators must conduct research into conditions such as: construction volume expected in the area; probablebid competition; availability <strong>of</strong> labor, materials, <strong>and</strong> equipment; <strong>and</strong> impacts <strong>of</strong> national <strong>and</strong> international markets.For additional assistance, contact estimating@va.govPage 9


<strong>VISN</strong> <strong>16</strong> - Escalation Rates<strong>VAMC</strong> COST GUIDE - BUILDING TYPE<strong>VISN</strong> <strong>16</strong>: South Central VA Health Care NetworkCURRENT BUILDING ONLY CONSTRUCTION UNIT COST PER SQUARE FOOT - VALID THROUGH OCTOBER 2014.USE FOR PLANNING PURPOSES ONLY - NOT FOR BUDGETINGPREPARED BY: <strong>Office</strong> <strong>of</strong> <strong>Construction</strong> & <strong>Facilities</strong> Management, <strong>Cost</strong> Estimating Service (003C2C)Date Prepared: JUNE, 2014YEAR2014 2015 20<strong>16</strong> 2017 2018ESCALATION RATE 3.00% 4.00% 5.00% 5.00% 5.00%NOTES:When using the above Escalation Rates over a number <strong>of</strong> years. These will need to be compounded to show true escalation.For additional assistance, contact estimating@va.govPage 10