13.07.2015 Views

Download The Kuwait Integrated Digital Field Bulletin Nº14 - KwIDF

Download The Kuwait Integrated Digital Field Bulletin Nº14 - KwIDF

Download The Kuwait Integrated Digital Field Bulletin Nº14 - KwIDF

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Champions in the <strong>Field</strong>SABRIYAH<strong>The</strong> teams in North <strong>Kuwait</strong> are every time more involved in<strong>KwIDF</strong>, and their support is outstanding. All of them are happyto take part of the project as it is key in attaining their productiongoals: reduce production loss, reduce shutdown time bymonitoring the wells in real-time, and improving HSE issues,especially during the summer.<strong>KwIDF</strong> Sabriyah acknowledges their efforts and commitment.Together we will step into our brighter future!Thank you all for your priceless Collaboration!Mr. Mohammed Al-Anzi,Section Head GC-23,in the NK <strong>Field</strong> CollaborationRoom.Part of the team of the team in the GC-23. Sitting: Mr. Saleh Al-Ajmi(Controller I), and Mr. Saleh Al-Azmi(Operator II Prod). Standing, from left:Mr. Mohammed Al-Qabandi; Mr.Harish Goel (<strong>KwIDF</strong> Sabriyah ProjectManager): Mr. Yagoub Al-Khaldi; Mr.Mohammed Al-Sumait; Mr. Ali Al-Najjar; and Mr. Mohammed Al-Ajmi.New ChokesOperatingSmoothly<strong>The</strong> new Well Surveillance <strong>KwIDF</strong> team in North <strong>Kuwait</strong>: Mr. RasheedAl-Owaisher (Snr. Petroleum Engineer); Mr. Rasheed Al-Kafeedi (Snr. PetroleumEngineer), and Mr. Abdullah Abbas (Petroleum Engineer UD).New actuated remote controlled chokeshave been installed in 23 pilot wells. Forthe past three months, the chokes havebeen operated locally, and the result iscompletely satisfying in the words of Mr.Saleh Al-Ajmi, Controller I of the GC-23:“<strong>The</strong>se chokes are really easy to operateand they are very effective too. Until now,they are operating smoothly and wehaven’t faced any problems”.Actuated remote control chokeinstalled by <strong>KwIDF</strong> SabiryahAs this newsletter goes to print, the SCADAworkstation is being installed in order tostart operating the chokes from the GCControl Room. “<strong>The</strong>y will be great help forus in controlling production and well flow”,states Mr. Al-Ajmi.Mr. Saleh Al-Ajmi, Controller I of the GC-23 is fully convinced of the importanceof <strong>KwIDF</strong> for their daily operations.PAGE 9<strong>Kuwait</strong> Oil Company

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!