13.07.2015 Views

Read/Download - SKB

Read/Download - SKB

Read/Download - SKB

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 1-2. Borehole locations at and near drill site DS6. Besides the core drilled boreholes KFM06A,KFM06B and KFM06C, the area incorporates a monitoring well in bedrock (HFM16), and two monitoringwells in the unconsolidated overburden (SFM0021 and SFM0068). The projection of inclinedboreholes on the horizontal plane at the ground surface (top of casing) is shown in the figure.The drilling operations were performed during two periods, between March 9 th 2005 to April13 th 2005 (percussion drilling) respectively April 27 th 2005 to June 29 th 2005 (core drilling).Drillcon Core AB, Nora, Sweden, was engaged for the drilling commission.Two different drilling equipments were employed for drilling KFM06C, a percussion drillingmachine for drilling the upper c.100 metres, whereas core drilling of the remaining part (section100.40–1,000.43 m) was carried out with a wireline core drilling system.In the present report, performance of and results from drilling of KFM06C, are presented. Thereport also treats investigations made during and immediately after drilling. All data are storedin the SICADA database, and are traceable by the activity plan number.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!