13.07.2015 Views

Read/Download - SKB

Read/Download - SKB

Read/Download - SKB

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.4.9 Deviation measurements 435.4.10 Measurements of the length difference between the compresseddrilling pipe string and as extended by its own weight 465.4.11 Hydraulic tests during drilling (wireline tests) 465.4.12 Groove milling 475.4.13 Consumables 475.4.14 Recovery measurements after cleaning by air-lift pumping 495.5 Additional work 496 References 51Appendix A Well Cad-plot of the percussion drilled part of borehole KFM06C 53Appendix B Well Cad-plot of the complete (percussion drilled and coredrilled) borehole KFM06C 55Appendix C Absolute pressure, borehole section 351.0–636.0 m 63

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!